EVERY GROUP OF PAGES, IN ONE PLACE.
SPM The Construction CFO publishes 6 systems, 48 trades, 52 benchmark pages, 15 case studies and the price list, all linked below by what each one does. Start with the system that matches the problem, then open the page for your trade. The full index of 895 pages is in llms.txt and the sitemap.
CFOS is a financial operating system covering cash control, job profitability, the cash flow cycle, working capital, trade benchmarking, and the operating model itself. It is delivered as one engagement: CFO advisory, with the bookkeeping and the controller work added on the higher tiers, so there are no scope gaps between the layers. Job costing is built against the client's own estimating assemblies. ControlQore, a job costing and WIP platform, is set up and managed on the Strategic and Platinum tiers, never billed as a line item.
6 SYSTEMS MAKE ONE OPERATING MODEL.
CFOS is built from 6 systems. Each one fixes one way a subcontractor loses control of cash or margin. Each has its own page that says what goes wrong and what SPM installs.
EACH OF 48 TRADES HAS ITS OWN PAGES.
Each trade has an operating system page, a CFO service page, the gross margin, net profit and overhead benchmark pages, and a job costing software page wherever the data supports one. 52 benchmark pages are published in all.
- Acoustic CeilingCFO serviceBenchmarksJob costing software
- BridgeCFO serviceBenchmarksJob costing software
- Civil and ExcavatingCFO serviceBenchmarksJob costing software
- ConcreteCFO serviceBenchmarksJob costing software
- Concrete FlatworkCFO serviceBenchmarksJob costing software
- Concrete PumpingCFO serviceBenchmarksJob costing software
- DemolitionCFO serviceBenchmarksJob costing software
- DrywallCFO serviceBenchmarksJob costing software
- EIFS and StuccoCFO serviceBenchmarksJob costing software
- ElectricalCFO serviceBenchmarksJob costing software
- ElevatorCFO serviceBenchmarksJob costing software
- Environmental RemediationCFO serviceBenchmarksJob costing software
- ExcavationCFO serviceBenchmarksJob costing software
- FiberCFO serviceBenchmarksJob costing software
- Fire AlarmCFO serviceBenchmarksJob costing software
- Fire ProtectionCFO serviceBenchmarksJob costing software
- FlooringCFO serviceBenchmarksJob costing software
- FramingCFO serviceBenchmarksJob costing software
- Curtain Wall and GlazingCFO serviceBenchmarksJob costing software
- GradingCFO serviceBenchmarksJob costing software
- HVACCFO serviceBenchmarksJob costing software
- InsulationCFO serviceBenchmarksJob costing software
- InteriorsCFO serviceBenchmarksJob costing software
- IrrigationCFO serviceBenchmarksJob costing software
- LandscapingCFO serviceBenchmarksJob costing software
- Low Voltage and AVCFO serviceBenchmarksJob costing software
- MarineCFO serviceBenchmarksJob costing software
- MasonryCFO serviceBenchmarksJob costing software
- MechanicalCFO serviceBenchmarksJob costing software
- PaintingCFO serviceBenchmarksJob costing software
- PavingCFO serviceBenchmarksJob costing software
- PlumbingCFO serviceBenchmarksJob costing software
- Precast ConcreteCFO serviceBenchmarksJob costing software
- Process PipingCFO serviceBenchmarksJob costing software
- RoofingCFO serviceBenchmarksJob costing software
- ScaffoldingCFO serviceBenchmarksJob costing software
- Security SystemsCFO serviceBenchmarksJob costing software
- SidingCFO serviceBenchmarksJob costing software
- SiteworkCFO serviceBenchmarksJob costing software
- SolarCFO serviceBenchmarksJob costing software
- Structural SteelCFO serviceBenchmarksJob costing software
- SWPPP and Erosion ControlCFO serviceBenchmarksJob costing software
- Tank and VesselCFO serviceBenchmarksJob costing software
- TelecomCFO serviceBenchmarksJob costing software
- Tile & StoneCFO serviceBenchmarksJob costing software
- TunnelCFO serviceBenchmarksJob costing software
- Underground UtilityCFO serviceBenchmarksJob costing software
- WaterproofingCFO serviceBenchmarksJob costing software
ONE METRIC FOR ALL 48 TRADES.
The four index pages put one metric for every trade in one table. The method behind the figures is on the methodology page, and the data is published as JSON and CSV under CC BY 4.0.
15 CLIENTS, ANONYMIZED.
Each case study states the revenue, the trade, what was found and the result. The results page puts them side by side.
- $7.1M civil and excavating contractor
- $3.4M civil and excavating contractor
- $4.1M to $2.8M concrete contractor
- $4.9M concrete contractor
- $3.2M electrical contractor
- $3.1M electrical service contractor
- $2.3M fiber contractor
- $6.7M Grading contractor
- $13.1M marine contractor, outside our core $1M to $12M range
- $25M marine contractor, outside our core $1M to $12M range
- $2.8M masonry contractor
- $550K sitework contractor, outside our core $1M to $12M range
- $5.2M SWPPP contractor
- $5M interior buildout contractor
- $700K turf and lawn contractor, outside our core $1M to $12M range
WHAT IT INCLUDES AND WHAT IT COSTS.
The rates for all 5 revenue bands are on one page. The service pages explain the 3 layers that one monthly fee covers.
WHO IS BEHIND IT, AND WHAT CLIENTS SAY.
10 HUBS, THE BLOG AND THE WORKBOOKS.
The hubs gather the explainers on one subject. The blog and the tool index hold the rest. 31 comparison pages set SPM beside the alternatives.
THE SAME SITE AS PLAIN TEXT.
llms.txt opens with the organization, the person and the ids this site uses, then lists every page. The assistants page states how to cite the site, and the sitemap lists every indexable URL.
