FIRE PROTECTION BENCHMARKS.
At $1M to $5M, fire protection contractors average 23% gross margin and spend 15% of revenue on overhead, which leaves 8% net profit before taxes (Run On CFOS Trade Benchmark Reference). The CFOS target is 11.5% net before taxes, the trade's average plus 3.5 points, never below 10%. Getting there means overhead at 14% and gross margin at 25.5%, and the distance is almost always overhead that was never loaded into the bid.
Rather talk it through first? Book a 20 minute call. Nothing gets sold on this call.
Want Josh to check your own numbers? Financial Health Snapshot, $1,500 one time. Your last 12 months read against your trade's benchmarks, with a 60 minute readout.
FIRE PROTECTION FINANCIAL BENCHMARKS. WHERE YOU SHOULD BE.
| METRIC | INDUSTRY AVERAGE | CFOS TARGET | AT $10M TO $25M | NOTES |
|---|---|---|---|---|
| Gross Margin ($1M to $5M) | 23% | 25.5% | 26% | Industry figure is 25% at $5M to $10M and 26% at $10M to $25M. |
| Overhead Rate ($1M to $5M) | 15% | 14% | 13% | Falls to 13% by $10M to $25M as fixed cost spreads over more revenue. |
| Net Profit Margin ($1M to $5M) | 8% | 11.5% | 13% | Industry figure is 11% at $5M to $10M and 13% at $10M to $25M. |
| Days Sales Outstanding | 90 days | 45 days | 30 days | Ninety days is weak, 45 is the target, 30 is strong. Nothing else moves cash faster. |
Showing $1M to $25M. The full data set for every revenue band is on Run On CFOS.
Industry figures are the AVERAGE for the trade at each revenue band, from the Run On CFOS Trade Benchmark Reference, not a floor. Net profit is stated before taxes. The CFOS target is what we build toward. The third column is what companies at $10M to $25M average, shown for direction of travel; that is a larger company, which is a different thing from a better managed one.
Below the fire protection average on margins? On a 20 minute call Josh will tell you where the gap is and what closes it.
Book a 20 minute callTHE FIRE PROTECTION GAP CALCULATOR. AVERAGE AGAINST TARGET, IN DOLLARS.
Put in your annual revenue. You get gross margin, overhead and net profit for fire protection contractors your size: the industry average and the CFOS target, in dollars a year. Nothing you type leaves this page.
Another trade too? The gap calculator for every trade.
Your figures show here once you put in your revenue.
Why aim for the target. An average is the middle of the pack: about half of companies do worse. And about 6 in 10 construction businesses close within 10 years (U.S. Bureau of Labor Statistics: about 40 percent of construction businesses opened in 2013 were still open in 2023). So the business in the middle is one of the ones that close. On those numbers, average is a business that closes within 10 years. That is why the CFOS target is a requirement.
Want your own numbers against these? The Financial Health Snapshot builds a CEO Report from your last 12 months and sets every figure against your trade.
FIRE PROTECTION GROSS MARGIN.
How to calculate: Gross margin is Revenue minus Direct Job Costs, divided by Revenue, times 100. Direct job costs include labour, materials, equipment and subcontracted work tied to the job. Not shop overhead, office staff or G and A.
In fire protection the two and a half points between the trade average and the target are in the small items that repeat. two and a half points is $25,000 on a $1M year and $125,000 on a $5M year. Firestopping costs $35 to $50 in material plus roughly $45 in labor per penetration. A job with a few hundred penetrations adds up to five figures of work. It gets estimated as an allowance and inspected as a requirement. Steel pipe installs at $15 to $25 a foot, and CPVC costs less, so your material choice moves the cost more than the bid margin does. Count penetrations and code fabrication separately. Neither one needs a price increase.
GROSS MARGIN BY REVENUE BAND, $1M TO $25M
| REVENUE BAND | INDUSTRY AVERAGE | CFOS TARGET |
|---|---|---|
| $1M to $5M | 23% | 25.5% |
| $5M to $10M | 25% | 27.5% |
| $10M to $25M | 26% | 28.5% |
FIRE PROTECTION OVERHEAD RATE.
How to calculate your overhead rate: Total overhead divided by Total Revenue, times 100. Overhead is every cost not attributable to a job: office staff, rent, insurance, software, vehicles not charged to work, and owner salary. It moves every month with revenue, which is why a rate set a year ago is wrong in both directions.
Fire protection has engineering inside its 15 percent overhead rate whether you planned it or not. The point down to 14 is worth $10,000 on a $1M year and $50,000 on a $5M year. NICET-certified design labor, hydraulic calculation work, state certificates of competency with fines up to $5,000 for a lapse, and inspection coordination on every project are office hours. They produce revenue nobody bills separately. Charge the design to the job it designed. That's the biggest fix here. The trade should reach 12 percent by $25M to $50M. Recalculate the rate every month to see whether the inspection division pays for the office or the other way around.
See the full benchmarks for every revenue band on Run On CFOS.
OVERHEAD RATE BY REVENUE BAND, $1M TO $25M
| REVENUE BAND | INDUSTRY AVERAGE | CFOS TARGET |
|---|---|---|
| $1M to $5M | 15% | 14% |
| $5M to $10M | 14% | 13% |
| $10M to $25M | 13% | 12% |
FIRE PROTECTION NET PROFIT MARGIN.
Net profit margin formula: Net Profit divided by Total Revenue, times 100. Unlike gross margin this measures what is left after overhead and G and A. It's the number that funds owner draw, debt paydown and growth.
Fire protection has one of the stronger floors in this dataset at 8 percent net before taxes. The three and a half points to a 11.5 percent target are $35,000 on a $1M year and $175,000 on a $5M year. Companies usually stay at the average because of a blended book. Inspection and maintenance work pays fast and small. Contract work pays big and slow. One P&L across both doesn't show which business pays for which, so you price both wrong for years. Splitting them takes a week of setup, and it changes every bid after that.
NET PROFIT MARGIN BY REVENUE BAND, $1M TO $25M
| REVENUE BAND | INDUSTRY AVERAGE | CFOS TARGET |
|---|---|---|
| $1M to $5M | 8% | 11.5% |
| $5M to $10M | 11% | 14.5% |
| $10M to $25M | 13% | 16.5% |
Benchmarks for subcontractors from $1M to $25M. This is a partial view of the Run On CFOS benchmark reference, which covers every band up to $500M and above. The full Run On CFOS benchmark reference is on runoncfos.com.
Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.
CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business. The bands above the $10M to $25M band are published at runoncfos.com as a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read them as a model and not as a survey result.
Trade figures are from the Run On CFOS Trade Benchmark Reference, published by Sulphur Prairie Operations, LLC. Net profit is stated before taxes. CFMA reports net income before taxes too, so the two read on the same basis. Re-validate against CFMA reporting on the normal quarterly cycle, per the benchmark reference's own instruction.
The reference itself is published at how the fire protection figures were built. The method behind these numbers is set out at runoncfos.com.
Cite as: Run On CFOS. Run On CFOS Trade Benchmark Reference: Fire Protection. 2026. Sulphur Prairie Operations, LLC. https://runoncfos.com/trades/fire-protection. CC BY 4.0.
- 2024 Construction Financial Benchmarker, Executive Summary, Construction Financial Management Association, 2024. 21.8% gross profit margin, 11.8% SG&A and 6.3% net income before taxes across all respondents, with a best-in-class top quartile at 11.9% net income before taxes.
- 2025 Construction Financial Benchmarker, Construction Financial Management Association, 2025. 6.7% net income before taxes (6.3% in 2023), a 7.1% EBIT margin and an 8.8% EBITDA margin at the median, with interest coverage of 30.4 times, across the 1,558 companies in the 2025 analysis (fiscal year 2024 results).
- 2025 Performance Benchmarks, Construction Companies, Jones Maresca and Company, 2025. Specialty contractor gross margin of 15% to 25%, net profit of 5% to 8% for a well managed company, and total indirect cost of 8% to 15%.
Each metric across every trade is published on Gross Margin by Trade, Overhead Rates by Trade and Net Profit by Trade, and the full dataset for all 48 trades across the published revenue bands is available as JSON and CSV, with one plain-language statement per row. Free to use with attribution.
FLAT MONTHLY FEE. NO SURPRISES.
Priced by trailing 12 month revenue. No hourly billing. No payroll. The one-time onboarding fee is right here in the table.
Built for subs doing $1M to $12M. Above $12.5M we quote.
| Last 12 months revenue | Core | Strategic | Platinum | One-time onboarding |
|---|---|---|---|---|
| Under $1M | $1,900 | $3,100 | $3,300 | $2,500 |
| $1M to $3.5M | $2,600 | $4,100 | $5,300 | $4,500 |
| $3.5M to $6.5M | $3,800 | $5,900 | $8,300 | $6,000 |
| $6.5M to $9.5M | $5,100 | $7,600 | $11,800 | $7,500 |
| $9.5M to $12.5M | $6,100 | $8,900 | $14,900 | $9,000 |
| Above $12.5M | Quoted | Quoted | Quoted | Quoted |
The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers, and it moves with your revenue band. Your first month is prorated, and your monthly engagement starts on the first of the first full month.
Just want the setup? Onboarding only is the same onboarding work with no monthly service after it, one time, at the onboarding fee plus $2,000. Start a monthly engagement later and $2,000 counts toward it. It starts at $4,500, and the price for every band is on the pricing page.
The three tier columns are the whole price. Which one fits depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.
- Online software only: QuickBooks, Sage, Viewpoint and similar. No VPN or hosted desktop.
- Not in any tier: payroll, pay applications, collections on receivables.
- Pricing valid through 2027.
What Core, Strategic and Platinum each include is on the pricing page.
