CFOS for QuickBooks, coming January 2027Join the waitlist: 12 months with no subscription fee
TRADE SERVICE · STRUCTURE & ENVELOPE CLUSTER

FRACTIONAL CFO FOR STRUCTURAL STEEL CONTRACTORS.

QUICK ANSWER

We manage the finance side for structural steel subcontractors doing $1M to $12M. You get job costing aligned to the way you estimate, a 13 week cash flow forecast, monthly WIP, and a CFO in the room every month. Pricing starts at $1,900 per month.

In structural steel nothing gets fabricated until paper clears the engineer of record, so you either bill the detailing phase or give it away. AISC's Code of Standard Practice puts shop and erection drawings on the fabricator. Most rejections trace to incomplete coordination and missing joint detail. Every review cycle moves the mill order, the delivery and the crane schedule. We code crane cost by lift and document standby the same day. The most expensive spread on the project idles for foundation problems, incomplete inspections and poor access, and erection crews are rarely the cause. Then we split fabrication and erection into two P&Ls and put a dated price basis with escalation into the contract. Steel moved roughly 18 percent in a year on layered tariffs, against fabrication benchmarked at $1,800 to $3,200 a ton.

BY JOSH LUEBKERPublished 2026-08-06Updated 2026-11-02
WHERE STRUCTURAL STEEL LOSES MONEY

THE THREE THINGS THAT DRAIN THE CASH.

LEAK 01

The Paper Gate

Nothing gets fabricated until shop drawings clear the EOR. Most rejections trace to coordination gaps the fabricator controls. Every review cycle moves the mill order, the delivery and the crane schedule. You either bill the detailing phase or you give it away.

LEAK 02

The Idle Crane

The most expensive spread on the project idles when foundations, inspections or access aren't ready. Erection crews are rarely the cause. Code crane cost by lift and document standby the same day. Then the GC's unreadiness becomes a claim you can bill.

LEAK 03

The Ton Tape

Steel rose 18 percent in a year on tariffs. Fabrication is benchmarked at $1,800 to $3,200 per ton, and you sell it into fixed-price contracts. Without escalation clauses and dated price bases, you're trading commodities with a crane.

THE MATH

FROM 8% TO 11.5% NET.

At $1M to $5M, the average structural steel sub earns 23% gross margin and spends 15% of revenue on overhead. What's left is 8% net profit before taxes (Run On CFOS Trade Benchmark Reference). The CFOS target is 11.5% before taxes. That is the structural steel average plus 3.5 points, and never below 10%. The book CONTROL's 12% is the rule of thumb across trades. It is not the industry average.

Two changes get you to the target. Overhead comes down 1 point to 14%, and gross margin comes up 2.5 points to 25.5%, so 25.5 minus 14 leaves 11.5. The gross margin points come from the three problems above, once you price them and bill for them. On a $3M year, every point is $30,000.

HOW SPM FIXES IT

WHAT WE CHANGE.

These are the structural steel problems we put a number on first. Each one gets its own cost code, its own line on the schedule of values or its own line in the 13 week cash forecast, so you can read it in the monthly meeting while the job is still open.

GAP CALCULATOR

THE STRUCTURAL STEEL GAP CALCULATOR. AVERAGE AGAINST TARGET, IN DOLLARS.

Put in your annual revenue. You get gross margin, overhead and net profit for structural steel contractors your size: the industry average and the CFOS target, in dollars a year. Nothing you type leaves this page.

Another trade too? The gap calculator for every trade.

Your figures show here once you put in your revenue.

Book a 20 minute call

Why aim for the target. An average is the middle of the pack: about half of companies do worse. And about 6 in 10 construction businesses close within 10 years (U.S. Bureau of Labor Statistics: about 40 percent of construction businesses opened in 2013 were still open in 2023). So the business in the middle is one of the ones that close. On those numbers, average is a business that closes within 10 years. That is why the CFOS target is a requirement.

Want your own numbers against these? The Financial Health Snapshot builds a CEO Report from your last 12 months and sets every figure against your trade.

PRICING

YOU PAY ONE FLAT MONTHLY FEE.

The fee is set by your trailing 12 month revenue. We don't bill by the hour and we don't do payroll. The one-time onboarding fee is in the table too.

Type a number and your band and its prices show here. The full table is below.

Built for subs doing $1M to $12M. Above $12.5M we quote.

Last 12 months revenueCoreStrategicPlatinumOne-time onboarding
Under $1M$1,900$3,100$3,300$2,500
$1M to $3.5M$2,600$4,100$5,300$4,500
$3.5M to $6.5M$3,800$5,900$8,300$6,000
$6.5M to $9.5M$5,100$7,600$11,800$7,500
$9.5M to $12.5M$6,100$8,900$14,900$9,000
Above $12.5MQuotedQuotedQuotedQuoted

The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers, and it moves with your revenue band. Your first month is prorated, and your monthly engagement starts on the first of the first full month.

Just want the setup? Onboarding only is the same onboarding work with no monthly service after it, one time, at the onboarding fee plus $2,000. Start a monthly engagement later and $2,000 counts toward it. It starts at $4,500, and the price for every band is on the pricing page.

The three tier columns are the whole price. Which one fits depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.

  • Online software only: QuickBooks, Sage, Viewpoint and similar. No VPN or hosted desktop.
  • Not in any tier: payroll, pay applications, collections on receivables.
  • Pricing valid through 2027.

What Core, Strategic and Platinum each include is on the pricing page.

Prevailing wage note: Structural Steel work often comes from public bids. On those jobs, certified payroll and wage classifications have to match the job cost record. ControlQore keeps the classification with the cost code, so the certified report and the job cost report come from the same data. Your office stops typing the same numbers twice every week.

COMMON QUESTIONS

FREQUENTLY ASKED.

Structural steel contractors at $1M to $5M net 8 percent on average, rising to 14 percent by $25M to $50M; the CFOS net profit target is 11.5 percent before taxes at $1M to $5M, the trade average plus 3.5 points. The trade's margins are among the healthier ones. Companies lose cash in the timing around detailing, fabrication and crane schedules. Every net profit figure here is gross margin minus overhead, stated before taxes, the same basis CFMA reports net income on.

See the full benchmarks for every revenue band on Run On CFOS.

Usually it needs the CFO work, and a full time CFO is more than it needs. At $5M to $10M, structural steel subs average 10% net profit before taxes (Run On CFOS Trade Benchmark Reference), and the CFOS target is 13.5%. On $5M of revenue every point is $50,000, so that difference is worth $175,000 a year. A full time CFO costs $150,000 or more in salary alone. SPM's published price for $3.5M to $6.5M is $3,800 a month for Core to $8,300 for Platinum.

Every review cycle moves fabrication release, mill delivery and the crane schedule later. Most rejections trace to coordination gaps and missing connection information the detailing team controls. Bill detailing as its own SOV line. Put approval milestones on the cash forecast. Do internal QC against the current AISC standard before you submit.

The paper decides. Industry delay analysis is blunt. Foundations, inspections and access cause most erection delays, and erection crews cause few. Code crane cost by lift and document site-readiness failures the day they happen, and you have your standby claim. Skip the documentation and you give away the most expensive hours on the project.

Yes, as divisions. Fabrication is tons through a shop, with AISC certification as the market's minimum. Erection is crews, cranes and weather. One blended P&L won't show which side earns, and you misprice both. On subcontracted splits, the schedule risk is in the contract between the two.

Date-stamp the price basis. Include an escalation clause indexed to a published steel reference. Buy out mill orders early on long jobs. Steel moved about 18 percent in a year on tariffs. A fixed bid without a clause is an unhedged position measured in tons.

A bookkeeper records history. SOV-billed detailing, crane cost codes, standby documentation, escalation clauses and divisional tracking are a control system. That's CFO work, and SPM does it for structural steel contractors.

Three tiers, and which one you are in depends on how much of the work you want off your desk. On Core we build your plan every month and your team does the work: job costing built against the way you estimate, a 13 week cash forecast, monthly WIP, and a monthly meeting that ends in decisions, while your bookkeeper keeps doing the books. On Strategic we build the plan, track it and adjust it every month: our team does the bookkeeping and the bank reconciliations, and the job costing and WIP software is set up and managed for you, on your own online software or ours. On Platinum we manage the money side for you every week: our team handles your bills and receivables the way an in-house controller would, and you approve every payment. We don't do payroll.

Sixty days. We migrate your books back to the start of your last taxable year and build your job costing structure from scratch, and on Strategic and Platinum we set up the job costing and WIP software too. You're fully up and working in two months. The onboarding fee is one time, the same for every tier, and set by your revenue band.

ControlQore is the job costing and WIP platform we use on the Strategic and Platinum tiers. It's built for contractors, costs less than the older tools, and has AI built in. We set it up and manage it, so you do not have to learn it. Core is the CFO work only, so it does not include the software.

A bookkeeper records what happened. We tell you what it means and what to do about it. We align job costing to your estimates, track WIP monthly, and hold a monthly meeting where you decide what to fix and who fixes it.
$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time

How structural steel CFO firms compare: the structural steel firm study, with every score and its source.

WHAT ELSE BREAKS IN STRUCTURAL STEEL

MORE PROBLEMS WE PUT A NUMBER ON.

The crane clock (the most expensive hour on site)

Crane rental cost code by lift

Crane and equipment cost applies on every erection day, sequence changes reshuffle picks, and site-readiness failures idle the most expensive spread on the project. Erection delay causes are usually upstream: "foundation issues, incomplete inspections, poor crane access, and site conditions that aren't ready when steel arrives. Erection crews are rarely the source of delays when prerequisites are properly handled.".

(Tower Steel Buildings delay analysis, 2026, quoted above)

The shop-drawing gate (nothing fabricates until paper approves)

Shop drawing approval delay cost

Same critical-path physics as glazing, in tons: shop and erection drawings must be produced (AISC COSP 4.2 puts that duty on the fabricator), reviewed by the EOR, and approved before fabrication releases. Most approval delays trace to incomplete coordination, missing connection information, and weak internal QC, and every review cycle pushes fabrication, delivery, and the crane schedule downstream.

"Most delays in high-rise steel detailing approvals stem from incomplete coordination, missing connection information, and weak internal quality control." (AEC Associates, 2026) AISC 2026 raised the bar further: "Fabricators can no longer afford to 'assume compliance.'"

MORE ON STRUCTURAL STEEL

EACH STRUCTURAL STEEL PROBLEM HAS ITS OWN PAGE.

OTHER CONCRETE AND STRUCTURE TRADES

Structural Steel is one of 8 trades in the concrete and structure family on our CFO for subcontractors page. Nearby trades with their own page:

WHAT THIS TIES INTO
FROM A GOOGLE REVIEW

IN THEIR OWN WORDS.

As the owner of a union steel company, I know how fast cash flow and job costing can get away from you. About a month ago I brought on Josh and his team at SPM the Construction CFO, and we saw improvements right away.

Josh and Stewart are both great to work with. They're not only good at what they do — they truly care about helping you succeed and they deliver results. I've known Josh personally for a while, and he's the same person in business as he is outside of it: honest, straightforward, and a genuinely good guy.

If you're a contractor looking to get your finances in order, I'd recommend SPM without hesitation.

Dino DePasquale, 5 star Google review

Read all 8 Google reviews, word for word

Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

THE CHEAPER OPTION WORKS AND TAKES LONGER.

If price comes first, plenty of CFOs and bookkeepers can get your construction company results. It often takes the better part of a year.

If you're a trade contractor, a sub or a GC who wins work, keeps the crews busy and still can't figure out where the money goes, we get in the weeds with you. We change the processes that cost you money on every job, build the ones you're missing and give you the formula, so you see results in 60 to 90 days.

Our guarantee holds when you come to every meeting, do the process and keep a strong pipeline of work. We can fix how your work pays. We can't fix having no work.

DO YOU KNOW YOUR TRUE MARGIN ON STRUCTURAL STEEL WORK?

Twenty minutes of questions about how you price structural steel work, what your jobs come in at once they close, and what keeps coming back to your desk. Nothing gets sold on that call and nothing gets proposed. If Josh can help, you'll set a longer second call.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. No pitch or proposal. Josh asks questions to find out if he can help.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.