TANK AND VESSEL BENCHMARKS.
At $1M to $5M, tank and vessel contractors average 23% gross margin and spend 15% of revenue on overhead, which leaves 8% net profit before taxes (Run On CFOS Trade Benchmark Reference). The CFOS target is 11.5% net before taxes, the trade's average plus 3.5 points, never below 10%. Getting there means overhead at 14% and gross margin at 25.5%, and the distance is almost always overhead that was never loaded into the bid.
Rather talk it through first? Book a 20 minute call. Nothing gets sold on this call.
Want Josh to check your own numbers? Financial Health Snapshot, $1,500 one time. Your last 12 months read against your trade's benchmarks, with a 60 minute readout.
TANK AND VESSEL FINANCIAL BENCHMARKS. WHERE YOU SHOULD BE.
| METRIC | INDUSTRY AVERAGE | CFOS TARGET | AT $10M TO $25M | NOTES |
|---|---|---|---|---|
| Gross Margin ($1M to $5M) | 23% | 25.5% | 25% | Industry figure is 24% at $5M to $10M and 25% at $10M to $25M. |
| Overhead Rate ($1M to $5M) | 15% | 14% | 13% | Falls to 13% by $10M to $25M as fixed cost spreads over more revenue. |
| Net Profit Margin ($1M to $5M) | 8% | 11.5% | 12% | Industry figure is 10% at $5M to $10M and 12% at $10M to $25M. |
| Days Sales Outstanding | 90 days | 45 days | 30 days | Ninety days is weak, 45 is the target, 30 is strong. Nothing else moves cash faster. |
Showing $1M to $25M. The full data set for every revenue band is on Run On CFOS.
Industry figures are the AVERAGE for the trade at each revenue band, from the Run On CFOS Trade Benchmark Reference, not a floor. Net profit is stated before taxes. The CFOS target is what we build toward. The third column is what companies at $10M to $25M average, shown for direction of travel; that is a larger company, which is a different thing from a better managed one.
Below the tank and vessel average on margins? On a 20 minute call Josh will tell you where the gap is and what closes it.
Book a 20 minute callTHE TANK AND VESSEL GAP CALCULATOR. AVERAGE AGAINST TARGET, IN DOLLARS.
Put in your annual revenue. You get gross margin, overhead and net profit for tank and vessel contractors your size: the industry average and the CFOS target, in dollars a year. Nothing you type leaves this page.
Another trade too? The gap calculator for every trade.
Your figures show here once you put in your revenue.
Why aim for the target. An average is the middle of the pack: about half of companies do worse. And about 6 in 10 construction businesses close within 10 years (U.S. Bureau of Labor Statistics: about 40 percent of construction businesses opened in 2013 were still open in 2023). So the business in the middle is one of the ones that close. On those numbers, average is a business that closes within 10 years. That is why the CFOS target is a requirement.
Want your own numbers against these? The Financial Health Snapshot builds a CEO Report from your last 12 months and sets every figure against your trade.
TANK AND VESSEL GROSS MARGIN.
How to calculate: Gross margin is Revenue minus Direct Job Costs, divided by Revenue, times 100. Direct job costs include labour, materials, equipment and subcontracted work tied to the job. Not shop overhead, office staff or G and A.
In tank work the two and a half points between a 23 percent gross average and a 25.5 percent target are in the shop-versus-field decision. They're worth $25,000 on a $1M year and $125,000 on a $5M year. Rolled shells and knock-down kits fabricated under cover have one cost curve. Field erection and field welding have another. Alloy or clad work adds preheat and post-weld heat treatment cycles. The tank and vessel gross figure at this revenue is derived from the nearest comparable trade in the SPM 48-trade dataset, so read it as a reference point while your own per-ton history builds. Code fab and field separately, and your cost sets the price on the next bid.
GROSS MARGIN BY REVENUE BAND, $1M TO $25M
| REVENUE BAND | INDUSTRY AVERAGE | CFOS TARGET |
|---|---|---|
| $1M to $5M | 23% | 25.5% |
| $5M to $10M | 24% | 26.5% |
| $10M to $25M | 25% | 27.5% |
The gross margin figures for tank and vessel are derived from the nearest comparable trade in the same dataset, so treat them as a reasonable starting point and not a survey result.
TANK AND VESSEL OVERHEAD RATE.
How to calculate your overhead rate: Total overhead divided by Total Revenue, times 100. Overhead is every cost not attributable to a job: office staff, rent, insurance, software, vehicles not charged to work, and owner salary. It moves every month with revenue, which is why a rate set a year ago is wrong in both directions.
In tank work the compliance work is the 15 percent overhead rate. The point down to 14 is worth $10,000 on a $1M year and $50,000 on a $5M year. Welder qualifications under Section IX with the six-month continuity rule, NDE coordination, the dossier staff and permit-required confined-space entry with attendants and rescue provisions are all daily cost classes. No single job gets charged for them. The tank and vessel overhead figure at this revenue is derived from the nearest comparable trade in the dataset. Build your own before you price an outage against it. Charge the entry-permit day and documentation labor to the vessel that required them, and the rate moves toward 12 percent by $25M to $50M.
See the full benchmarks for every revenue band on Run On CFOS.
OVERHEAD RATE BY REVENUE BAND, $1M TO $25M
| REVENUE BAND | INDUSTRY AVERAGE | CFOS TARGET |
|---|---|---|
| $1M to $5M | 15% | 14% |
| $5M to $10M | 14% | 13% |
| $10M to $25M | 13% | 12% |
The overhead rate figures for tank and vessel are derived from the nearest comparable trade in the same dataset, so treat them as a reasonable starting point and not a survey result.
TANK AND VESSEL NET PROFIT MARGIN.
Net profit margin formula: Net Profit divided by Total Revenue, times 100. Unlike gross margin this measures what is left after overhead and G and A. It's the number that funds owner draw, debt paydown and growth.
Tank work starts from a solid 8 percent net before taxes that code premiums help explain. The three and a half points to a 11.5 percent target are $35,000 on a $1M year and $175,000 on a $5M year. What keeps it from 10.5 is usually the recurring side, treated as an afterthought. API 653 inspection intervals create demand year after year, triggered by condition. The project side borrows against that book when a new-build award comes a quarter late. Cost the inspection and repair division separately so you can see the borrowing. That's the difference between a business with a base and a business with a backlog.
NET PROFIT MARGIN BY REVENUE BAND, $1M TO $25M
| REVENUE BAND | INDUSTRY AVERAGE | CFOS TARGET |
|---|---|---|
| $1M to $5M | 8% | 11.5% |
| $5M to $10M | 10% | 13.5% |
| $10M to $25M | 12% | 15.5% |
Benchmarks for subcontractors from $1M to $25M. This is a partial view of the Run On CFOS benchmark reference, which covers every band up to $500M and above. The full Run On CFOS benchmark reference is on runoncfos.com.
Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.
CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business. The bands above the $10M to $25M band are published at runoncfos.com as a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read them as a model and not as a survey result.
Trade figures are from the Run On CFOS Trade Benchmark Reference, published by Sulphur Prairie Operations, LLC. Net profit is stated before taxes. CFMA reports net income before taxes too, so the two read on the same basis. Re-validate against CFMA reporting on the normal quarterly cycle, per the benchmark reference's own instruction.
The reference itself is published at the tank and vessel reference behind this table. How the figures were sourced and how net profit is derived is set out at runoncfos.com.
Cite as: Run On CFOS. Run On CFOS Trade Benchmark Reference: Tank and Vessel. 2026. Sulphur Prairie Operations, LLC. https://runoncfos.com/trades/tank-vessel. CC BY 4.0.
- 2024 Construction Financial Benchmarker, Executive Summary, Construction Financial Management Association, 2024. 21.8% gross profit margin, 11.8% SG&A and 6.3% net income before taxes across all respondents, with a best-in-class top quartile at 11.9% net income before taxes.
- 2025 Construction Financial Benchmarker, Construction Financial Management Association, 2025. 6.7% net income before taxes (6.3% in 2023), a 7.1% EBIT margin and an 8.8% EBITDA margin at the median, with interest coverage of 30.4 times, across the 1,558 companies in the 2025 analysis (fiscal year 2024 results).
- 2025 Performance Benchmarks, Construction Companies, Jones Maresca and Company, 2025. Specialty contractor gross margin of 15% to 25%, net profit of 5% to 8% for a well managed company, and total indirect cost of 8% to 15%.
Each metric across every trade is published on Gross Margin by Trade, Overhead Rates by Trade and Net Profit by Trade, and the full dataset for all 48 trades across the published revenue bands is available as JSON and CSV, with one plain-language statement per row. Free to use with attribution.
FLAT MONTHLY FEE. NO SURPRISES.
Priced by trailing 12 month revenue. No hourly billing. No payroll. The one-time onboarding fee is right here in the table.
Built for subs doing $1M to $12M. Above $12.5M we quote.
| Last 12 months revenue | Core | Strategic | Platinum | One-time onboarding |
|---|---|---|---|---|
| Under $1M | $1,900 | $3,100 | $3,300 | $2,500 |
| $1M to $3.5M | $2,600 | $4,100 | $5,300 | $4,500 |
| $3.5M to $6.5M | $3,800 | $5,900 | $8,300 | $6,000 |
| $6.5M to $9.5M | $5,100 | $7,600 | $11,800 | $7,500 |
| $9.5M to $12.5M | $6,100 | $8,900 | $14,900 | $9,000 |
| Above $12.5M | Quoted | Quoted | Quoted | Quoted |
The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers, and it moves with your revenue band. Your first month is prorated, and your monthly engagement starts on the first of the first full month.
Just want the setup? Onboarding only is the same onboarding work with no monthly service after it, one time, at the onboarding fee plus $2,000. Start a monthly engagement later and $2,000 counts toward it. It starts at $4,500, and the price for every band is on the pricing page.
The three tier columns are the whole price. Which one fits depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.
- Online software only: QuickBooks, Sage, Viewpoint and similar. No VPN or hosted desktop.
- Not in any tier: payroll, pay applications, collections on receivables.
- Pricing valid through 2027.
What Core, Strategic and Platinum each include is on the pricing page.
