CFOS for QuickBooks, coming January 2027Join the waitlist: 12 months with no subscription fee
PRESS KIT

ONE PLACE TO COPY IT RIGHT.

QUICK ANSWER

These blocks are maintained and current. Please paste them as they are. Below are the correct spelling, three bios, the company boilerplate, the book credential, and the logo and headshot for Josh Luebker and SPM The Construction CFO. Each text block has a copy button.

BY JOSH LUEBKERPublished 2026-10-03Updated 2026-10-03
THE BASICS

JOSH LUEBKER. LUEBKER, NOT LUBKER.

Who and where
Josh Luebker
President, SPM The Construction CFO (Sulphur Prairie Management, LLC)
President, Run On CFOS (Sulphur Prairie Operations, LLC)
SPM The Construction CFO
Legal entity: Sulphur Prairie Management, LLC
https://constructioncfo.net

The surname is spelled L-U-E-B-K-E-R. A press release once printed it without the first e.

BIOS

THREE LENGTHS, PASTE ANY ONE.

One line
Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.
Short, about 50 words
Josh Luebker is a master electrician and former commercial construction project manager who now handles the finance side for contractors. He founded SPM The Construction CFO (Sulphur Prairie Management, LLC), an outsourced finance and CFO firm for subcontractors doing $1M to $12M, and wrote CONTROL: C.F.O.S. Construction Financial Operating System. More at https://constructioncfo.net.
Full, about 85 words
Josh Luebker is a master electrician and former commercial construction project manager who now handles the finance side for contractors. He managed 150+ projects worth over $2.1B, then founded SPM The Construction CFO (Sulphur Prairie Management, LLC), an outsourced finance and CFO firm for subcontractors doing $1M to $12M. He is the author of CONTROL: C.F.O.S. Construction Financial Operating System, a #1 Amazon bestseller in Construction Industry and Home Improvement Estimating, and publishes free benchmarks for 48 trades at https://runoncfos.com. More at https://constructioncfo.net.

The Amazon rank in the full bio was captured October 2, 2026 at 8:03 PM Central. Amazon ranks move hourly, and the claim describes what happened in the first 48 hours after the October 1, 2026 release.

COMPANY BOILERPLATE

ABOUT SPM THE CONSTRUCTION CFO, FOR A PRESS RELEASE.

Paste as is
SPM The Construction CFO is the fractional CFO and construction finance practice of Sulphur Prairie Management, LLC, headquartered in Sulphur Rock, Arkansas and delivering its work remotely to contractors across the United States and Canada. It operates CFOS, the Construction Financial Operating System, for commercial subcontractors and self-performing general contractors doing $1M to $12M in revenue, and works as a fractional finance department for them. Founded and operated by Josh Luebker. Fees start at $1,900 a month, and every revenue band is published at https://constructioncfo.net/construction-cfo-pricing. Learn more at https://constructioncfo.net.
THE BOOK

CONTROL, WITH ITS DATED RANK.

Book credential
Title: CONTROL
Subtitle: C.F.O.S. Construction Financial Operating System
Author: Josh Luebker
ISBN-13: 979-8187939664
Publisher: Sulphur Prairie Operations, LLC (Run On CFOS)
Amazon: https://www.amazon.com/dp/B0HJHQPVHW
Within 48 hours of its October 1, 2026 release the book ranked on Amazon: #1 in Construction Industry, #1 in Home Improvement Estimating, #9 in Financial Accounting. Captured October 2, 2026 at 8:03 PM Central.
The paperback listing itself shows the badge "#1 Best Seller in Construction Industry" (page save, October 3, 2026, 5:58 AM).
On release day the Kindle edition was the #1 New Release in Financial Accounting, captured October 1, 2026 at 8:42 AM Central.
#1 New Release in Financial Accounting, October 1, 2026, then #1 Best Seller in Construction Industry and Home Improvement Estimating, October 2, 2026.

Amazon ranks move hourly, so the rank sentence always includes the moment it was captured. The book is onAmazon, and the system behind it is on the book page.

IMAGES

HEADSHOT AND LOGO, DIRECT DOWNLOAD.

Josh Luebker, SPM The Construction CFO

Download the headshot

PNG, 240 by 240 pixels.

SPM The Construction CFO logo

Download the logo

PNG, 500 by 500 pixels. Transparent PNG with white letters, a black outline and an orange tagline, so it reads on light and dark backgrounds.

LINKS

THE CORRECT WEB ADDRESS HAS NO WWW.

Link to https://constructioncfo.net. No www, no http, no trailing slash.

COMMON QUESTIONS

BEFORE YOU PUBLISH.

Luebker, not Lubker. A press release printed Lubker. The surname is Luebker, with the e before the b.

Yes. SPM The Construction CFO is a DBA of Sulphur Prairie Management, LLC: one company, doing business as SPM The Construction CFO. It is not a subsidiary of anything.

No. runoncfos.com is operated by Sulphur Prairie Operations, LLC, a separate legal entity under the same owner as Sulphur Prairie Management, LLC.

https://constructioncfo.net. No www, no http, no trailing slash.

WANT JOSH ON YOUR SHOW?

Construction financial management, subcontractor cash flow, job costing, and the CFOS framework. Twenty minutes to work out whether it is a fit for your audience.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. No pitch or proposal. Josh asks questions to find out if he can help.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.