CFOS for QuickBooks, coming January 2027Join the waitlist: 12 months with no subscription fee
TRADE SERVICE · VERTICAL TRANSPORTATION CLUSTER

FRACTIONAL CFO FOR ELEVATOR CONTRACTORS.

QUICK ANSWER

We manage the finance side for elevator subcontractors doing $1M to $12M. You get job costing aligned to the way you estimate, a 13 week cash flow forecast, monthly WIP, and a CFO in the room every month. Pricing starts at $1,900 per month.

Elevator is the one trade in this dataset with a recurring book big enough to be the business, so we build the per-unit contract P&L first. Full-maintenance contracts cost $500 to $1,200 a month per traction unit and $400 to $900 hydraulic. Price them flat across unit ages and the best cars pay for the worst until renewal. We track callback rate per unit and reprice at renewal. That's underwriting for this trade. On the project side we handle install and modernization on construction paper. That's equipment deposits, hoistway-readiness claims when the crew idles on somebody else's shaft, and retainage tracked against the state inspection.

BY JOSH LUEBKERPublished 2026-08-06Updated 2026-11-02
WHERE ELEVATOR LOSES MONEY

THE THREE THINGS THAT DRAIN THE CASH.

LEAK 01

The Annuity Underneath

Maintenance contracts at $500 to $1,200 per unit per month recur and compound. They're why elevator has one of the best net-profit floors in the 48-trade dataset. Track per-unit contract P&L and you own an asset. Skip it and you own a route.

LEAK 02

The Proprietary Wall

OEM controllers, $10,000 diagnostic tools and obsolescence declarations decide what an independent can service. Every proprietary install makes that list shorter. Your plan starts with a map of what you can maintain.

LEAK 03

The Flat-Priced Portfolio

Full-maintenance pricing is an actuarial bet. Price a portfolio flat across unit ages and the best cars pay for the worst. Track callback rates per unit and reprice at renewal. That's underwriting for this trade.

THE MATH

FROM 9% TO 12.5% NET.

At $1M to $5M, the average elevator sub earns 27% gross margin and spends 18% of revenue on overhead. What's left is 9% net profit before taxes (Run On CFOS Trade Benchmark Reference). The CFOS target is 12.5% before taxes. That is the elevator average plus 3.5 points, and never below 10%. The book CONTROL's 12% is the rule of thumb across trades. It is not the industry average.

Two changes get you to the target. Overhead comes down 1 point to 17%, and gross margin comes up 2.5 points to 29.5%, so 29.5 minus 17 leaves 12.5. The gross margin points come from the three problems above, once you price them and bill for them. On a $3M year, every point is $30,000.

HOW SPM FIXES IT

WHAT WE CHANGE.

These are the elevator problems we put a number on first. Each one gets its own cost code, its own line on the schedule of values or its own line in the 13 week cash forecast, so you can read it in the monthly meeting while the job is still open.

GAP CALCULATOR

THE ELEVATOR GAP CALCULATOR. AVERAGE AGAINST TARGET, IN DOLLARS.

Put in your annual revenue. You get gross margin, overhead and net profit for elevator contractors your size: the industry average and the CFOS target, in dollars a year. Nothing you type leaves this page.

Another trade too? The gap calculator for every trade.

Your figures show here once you put in your revenue.

Book a 20 minute call

Why aim for the target. An average is the middle of the pack: about half of companies do worse. And about 6 in 10 construction businesses close within 10 years (U.S. Bureau of Labor Statistics: about 40 percent of construction businesses opened in 2013 were still open in 2023). So the business in the middle is one of the ones that close. On those numbers, average is a business that closes within 10 years. That is why the CFOS target is a requirement.

Want your own numbers against these? The Financial Health Snapshot builds a CEO Report from your last 12 months and sets every figure against your trade.

PRICING

YOU PAY ONE FLAT MONTHLY FEE.

The fee is set by your trailing 12 month revenue. We don't bill by the hour and we don't do payroll. The one-time onboarding fee is in the table too.

Type a number and your band and its prices show here. The full table is below.

Built for subs doing $1M to $12M. Above $12.5M we quote.

Last 12 months revenueCoreStrategicPlatinumOne-time onboarding
Under $1M$1,900$3,100$3,300$2,500
$1M to $3.5M$2,600$4,100$5,300$4,500
$3.5M to $6.5M$3,800$5,900$8,300$6,000
$6.5M to $9.5M$5,100$7,600$11,800$7,500
$9.5M to $12.5M$6,100$8,900$14,900$9,000
Above $12.5MQuotedQuotedQuotedQuoted

The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers, and it moves with your revenue band. Your first month is prorated, and your monthly engagement starts on the first of the first full month.

Just want the setup? Onboarding only is the same onboarding work with no monthly service after it, one time, at the onboarding fee plus $2,000. Start a monthly engagement later and $2,000 counts toward it. It starts at $4,500, and the price for every band is on the pricing page.

The three tier columns are the whole price. Which one fits depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.

  • Online software only: QuickBooks, Sage, Viewpoint and similar. No VPN or hosted desktop.
  • Not in any tier: payroll, pay applications, collections on receivables.
  • Pricing valid through 2027.

What Core, Strategic and Platinum each include is on the pricing page.

COMMON QUESTIONS

FREQUENTLY ASKED.

Elevator contractors at $1M to $5M net about 9 percent on the SPM 48-trade benchmark dataset, among the strongest floors of the 48 trades, rising to 15 percent by $25M to $50M; the CFOS net profit target is 12.5 percent before taxes at $1M to $5M, the trade average plus 3.5 points. The floor comes from the maintenance annuity inside the average. Operators without a contract book earn well below it. Every net profit figure here is gross margin minus overhead, stated before taxes, the same basis CFMA reports net income on.

See the full benchmarks for every revenue band on Run On CFOS.

Usually it needs the CFO work, and a full time CFO is more than it needs. At $5M to $10M, elevator subs average 11% net profit before taxes (Run On CFOS Trade Benchmark Reference), and the CFOS target is 14.5%. On $5M of revenue every point is $50,000, so that difference is worth $175,000 a year. A full time CFO costs $150,000 or more in salary alone. SPM's published price for $3.5M to $6.5M is $3,800 a month for Core to $8,300 for Platinum.

They recur at $500 to $1,200 per traction unit per month and compound as the portfolio grows. They work like insurance: the contractor takes on responsibility and controls the service schedule. Recurring books sell at premium multiples across the adjacent trades, and elevator's is the strongest annuity in construction.

It decides what you can service. Proprietary controllers and diagnostic tools (reported as high as $10,000) keep independents off much equipment newer than about 15 years. OEM obsolescence declarations push buildings toward OEM parts and modernization. An independent's plan starts with mapping the open-architecture installed base and pricing within it.

Per unit, from actuals: callback rate, visit cost and parts exposure by unit age and equipment type, repriced at renewal. With flat pricing across a mixed-age portfolio, the best cars pay for the worst. Pricing by age band is how this trade underwrites.

Construction paper. That means long equipment leads with deposits, hoistway-readiness dependencies that idle crews, pay applications and retainage. Bill deposits and stored equipment on the SOV. Document readiness failures the day they happen. Track the project side's cash curve separately from the maintenance book's.

Sulphur Prairie Management, operating as SPM The Construction CFO, publishes the 48-trade benchmark dataset these numbers come from. SPM's deepest specialization is 24 core commercial trades, and SPM works with elevator contractors who want the same financial system: onboarding, clean books, a maintained 13-week cash flow forecast, and monthly health reviews, with job costing simplified to what the business operates on. The full 48-trade benchmark reference exists so owners in every trade can measure against real numbers.

Three tiers, and which one you are in depends on how much of the work you want off your desk. On Core we build your plan every month and your team does the work: job costing built against the way you estimate, a 13 week cash forecast, monthly WIP, and a monthly meeting that ends in decisions, while your bookkeeper keeps doing the books. On Strategic we build the plan, track it and adjust it every month: our team does the bookkeeping and the bank reconciliations, and the job costing and WIP software is set up and managed for you, on your own online software or ours. On Platinum we manage the money side for you every week: our team handles your bills and receivables the way an in-house controller would, and you approve every payment. We don't do payroll.

Sixty days. We migrate your books back to the start of your last taxable year and build your job costing structure from scratch, and on Strategic and Platinum we set up the job costing and WIP software too. You're fully up and working in two months. The onboarding fee is one time, the same for every tier, and set by your revenue band.

ControlQore is the job costing and WIP platform we use on the Strategic and Platinum tiers. It's built for contractors, costs less than the older tools, and has AI built in. We set it up and manage it, so you do not have to learn it. Core is the CFO work only, so it does not include the software.

A bookkeeper records what happened. We tell you what it means and what to do about it. We align job costing to your estimates, track WIP monthly, and hold a monthly meeting where you decide what to fix and who fixes it.
$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time

How elevator CFO firms compare: the elevator firm study, with every score and its source.

OTHER MEP AND SYSTEMS TRADES

Elevator is one of 14 trades in the MEP and systems family on our CFO for subcontractors page. Nearby trades with their own page:

WHAT THIS TIES INTO
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

THE CHEAPER OPTION WORKS AND TAKES LONGER.

If price comes first, plenty of CFOs and bookkeepers can get your construction company results. It often takes the better part of a year.

If you're a trade contractor, a sub or a GC who wins work, keeps the crews busy and still can't figure out where the money goes, we get in the weeds with you. We change the processes that cost you money on every job, build the ones you're missing and give you the formula, so you see results in 60 to 90 days.

Our guarantee holds when you come to every meeting, do the process and keep a strong pipeline of work. We can fix how your work pays. We can't fix having no work.

DO YOU KNOW YOUR TRUE MARGIN ON ELEVATOR WORK?

Twenty minutes of questions about how you price elevator work, what your jobs come in at once they close, and what keeps coming back to your desk. Nothing gets sold on that call and nothing gets proposed. If Josh can help, you'll set a longer second call.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. No pitch or proposal. Josh asks questions to find out if he can help.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.