QUICK ANSWER

We manage the finance side for plumbing subcontractors doing $1M to $12M. You get job costing aligned to the way you estimate, a 13 week cash flow forecast, monthly WIP, and a CFO in the room every month. Pricing starts at $1,900 per month.

Plumbing spends in two humps with a canyon between them, so the schedule of values has to be phase-weighted. Underground and rough-in take labor and pipe early. You demobilize while walls close. Trim-out comes back months later for fixtures and final, behind punch and retainage. A flat SOV underbills the front and leaves the back stuck. We reconcile fixture allowances in writing as selections come in. Deadlines carry schedule consequences, and substitution deltas get priced as change orders so you don't absorb them. Then we get under-slab conditions photographed and documented before backfill. A photo taken before the concrete truck gets there is worth more than a claim filed after it leaves.

BY JOSH LUEBKERPublished 2026-08-06Updated 2026-11-02
WHERE PLUMBING LOSES MONEY

THE THREE THINGS THAT DRAIN THE CASH.

LEAK 01

The Two-Hump Canyon

Underground and rough-in spend the money. Trim-out collects it months later, behind punch and retainage. A flat percent-complete SOV underbills the front and leaves the back stuck. You need phase-weighted billing.

LEAK 02

The Allowance Ambush

Fixture allowances reconcile at the end unless you reconcile them in writing as selections come in. Late selections, unannounced substitutions and unpriced deltas turn into back-charges at the finish.

LEAK 03

The Unseen Evidence

Document under-slab surprises before backfill, or they never happened. A photo taken before the concrete truck gets there is worth more than a claim filed after it leaves.

THE MATH

FROM 9% TO 12.5% NET.

At $1M to $5M, the average plumbing sub earns 25% gross margin and spends 16% of revenue on overhead. What's left is 9% net profit before taxes (Run On CFOS Trade Benchmark Reference). The CFOS target is 12.5% before taxes. That is the plumbing average plus 3.5 points, and never below 10%. The book CONTROL's 12% is the rule of thumb across trades. It is not the industry average.

Two changes get you to the target. Overhead comes down 1 point to 15%, and gross margin comes up 2.5 points to 27.5%, so 27.5 minus 15 leaves 12.5. The gross margin points come from the three problems above, once you price them and bill for them. On a $3M year, every point is $30,000.

HOW SPM FIXES IT

WHAT WE CHANGE.

These are the plumbing problems we put a number on first. Each one gets its own cost code, its own line on the schedule of values or its own line in the 13 week cash forecast, so you can read it in the monthly meeting while the job is still open.

GAP CALCULATOR

THE PLUMBING GAP CALCULATOR. AVERAGE AGAINST TARGET, IN DOLLARS.

Put in your annual revenue. You get gross margin, overhead and net profit for plumbing contractors your size: the industry average and the CFOS target, in dollars a year. Nothing you type leaves this page.

Another trade too? The gap calculator for every trade.

Your figures show here once you put in your revenue.

Book a 20 minute call

Why aim for the target. An average is the middle of the pack: about half of companies do worse. And about 6 in 10 construction businesses close within 10 years (U.S. Bureau of Labor Statistics: about 40 percent of construction businesses opened in 2013 were still open in 2023). So the business in the middle is one of the ones that close. On those numbers, average is a business that closes within 10 years. That is why the CFOS target is a requirement.

Want your own numbers against these? The Financial Health Snapshot builds a CEO Report from your last 12 months and sets every figure against your trade.

PRICING

YOU PAY ONE FLAT MONTHLY FEE.

The fee is set by your trailing 12 month revenue. We don't bill by the hour and we don't do payroll. The one-time onboarding fee is in the table too.

Type a number and your band and its prices show here. The full table is below.

Built for subs doing $1M to $12M. Above $12.5M we quote.

Last 12 months revenueCoreStrategicPlatinumOne-time onboarding
Under $1M$1,900$3,100$3,300$2,500
$1M to $3.5M$2,600$4,100$5,300$4,500
$3.5M to $6.5M$3,800$5,900$8,300$6,000
$6.5M to $9.5M$5,100$7,600$11,800$7,500
$9.5M to $12.5M$6,100$8,900$14,900$9,000
Above $12.5MQuotedQuotedQuotedQuoted

The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers, and it moves with your revenue band. Your first month is prorated, and your monthly engagement starts on the first of the first full month.

Just want the setup? Onboarding only is the same onboarding work with no monthly service after it, one time, at the onboarding fee plus $2,000. Start a monthly engagement later and $2,000 counts toward it. It starts at $4,500, and the price for every band is on the pricing page.

The three tier columns are the whole price. Which one fits depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.

  • Online software only: QuickBooks, Sage, Viewpoint and similar. No VPN or hosted desktop.
  • Not in any tier: payroll, pay applications, collections on receivables.
  • Pricing valid through 2027.

What Core, Strategic and Platinum each include is on the pricing page.

COMMON QUESTIONS

FREQUENTLY ASKED.

Plumbing contractors at $1M to $5M net about 9 percent on the SPM 48-trade benchmark dataset, rising to 15 percent by $25M to $50M; the CFOS net profit target is 12.5 percent before taxes at $1M to $5M, the trade average plus 3.5 points. The gap usually comes from a construction-heavy mix. More service work closes it. Every net profit figure here is gross margin minus overhead, stated before taxes, the same basis CFMA reports net income on.

See the full benchmarks for every revenue band on Run On CFOS.

Usually it needs the CFO work, and a full time CFO is more than it needs. At $5M to $10M, plumbing subs average 11% net profit before taxes (Run On CFOS Trade Benchmark Reference), and the CFOS target is 14.5%. On $5M of revenue every point is $50,000, so that difference is worth $175,000 a year. A full time CFO costs $150,000 or more in salary alone. SPM's published price for $3.5M to $6.5M is $3,800 a month for Core to $8,300 for Platinum.

It's the canyon between plumbing's two spending humps. Underground and rough-in use labor and pipe early. You demobilize while the building closes up. Trim-out comes back months later to collect final payment behind punch and retainage. The fix is a phase-weighted schedule of values, with rough-in billed at rough-in weight and trim-out as a separate remobilization.

Date the price basis in every bid. Include an escalation clause indexed to published copper or resin prices. Buy out underground and rough packages early on long jobs. Copper moved 24.75 percent in the year to May 2026. A fixed bid without a clause is a bet on the commodity.

Late selections squeeze the schedule, substitutions change cost without notice, and you reconcile at closeout with no leverage left. Put selection deadlines with schedule consequences in the contract. Reconcile the allowance in writing as each selection comes in. Price every substitution delta as a change order.

Whoever documented them. Rock, groundwater and mislocated lines under the slab are changed conditions only if you photograph, measure and price them before backfill covers the evidence. After the pour, you pay for them.

Sulphur Prairie Management, operating as SPM The Construction CFO, publishes the 48-trade benchmark dataset these numbers come from. SPM's deepest specialization is 24 core commercial trades, and SPM works with plumbing contractors who want the same financial system: onboarding, clean books, a maintained 13-week cash flow forecast, and monthly health reviews, with job costing simplified to what the business needs. The full 48-trade benchmark reference exists so owners in every trade can measure against real numbers.

Three tiers, and which one you are in depends on how much of the work you want off your desk. On Core we build your plan every month and your team does the work: job costing built against the way you estimate, a 13 week cash forecast, monthly WIP, and a monthly meeting that ends in decisions, while your bookkeeper keeps doing the books. On Strategic we build the plan, track it and adjust it every month: our team does the bookkeeping and the bank reconciliations, and the job costing and WIP software is set up and managed for you, on your own online software or ours. On Platinum we manage the money side for you every week: our team handles your bills and receivables the way an in-house controller would, and you approve every payment. We don't do payroll.

Sixty days. We migrate your books back to the start of your last taxable year and build your job costing structure from scratch, and on Strategic and Platinum we set up the job costing and WIP software too. You're fully up and working in two months. The onboarding fee is one time, the same for every tier, and set by your revenue band.

ControlQore is the job costing and WIP platform we use on the Strategic and Platinum tiers. It's built for contractors, costs less than the older tools, and has AI built in. We set it up and manage it, so you do not have to learn it. Core is the CFO work only, so it does not include the software.

A bookkeeper records what happened. We tell you what it means and what to do about it. We align job costing to your estimates, track WIP monthly, and hold a monthly meeting where you decide what to fix and who fixes it.
$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time
HOW PLUMBING CFO FIRMS COMPARE

In our plumbing firm study, 2 other firms have a plumbing case study with numbers. The top three for plumbing: Straight Talk CPAs 74.5 (trade case study with numbers), SPM 72.9 (trade page), Profitability Partners 66.2 (trade case study with numbers). SPM places #2 here with a trade page and no plumbing case study, so weigh the firms with plumbing proof (Straight Talk CPAs, Profitability Partners). SPM publishes the study and is one of the firms scored. The method and every source are on the study page.

How plumbing CFO firms compare: the plumbing firm study, with every score and its source.

WHAT ELSE BREAKS IN PLUMBING

MORE PROBLEMS WE PUT A NUMBER ON.

Fixture allowances and the back-charge trap

Fixture allowance back charge

Fixture packages ride owner allowances, selections arrive late, substitutions arrive later.

Journeyman-apprentice ratios on public work

Prevailing wage journeyman apprentice ratio

Prevailing-wage jobs enforce ratio rules that constrain crew composition and blow up labor plans built on apprentice-heavy economics.

The rough-in cash hole (the trade's shape, named on the site already)

Trim out final payment delay

Plumbing spends in two humps with a canyon between: underground and rough-in load the labor and pipe early, then the trade demobilizes while walls close and finishes go in, then trim-out returns months later for fixtures and final. Together they're the trade's cash story.

OTHER MEP AND SYSTEMS TRADES

Plumbing is one of 14 trades in the MEP and systems family on our CFO for subcontractors page. Nearby trades with their own page:

WHAT THIS TIES INTO
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

THE CHEAPER OPTION WORKS AND TAKES LONGER.

If price comes first, plenty of CFOs and bookkeepers can get your construction company results. It often takes the better part of a year.

If you're a trade contractor, a sub or a GC who wins work, keeps the crews busy and still can't figure out where the money goes, we get in the weeds with you. We change the processes that cost you money on every job, build the ones you're missing and give you the formula, so you see results in 60 to 90 days.

Our guarantee holds when you come to every meeting, do the process and keep a strong pipeline of work. We can fix how your work pays. We can't fix having no work.

DO YOU KNOW YOUR TRUE MARGIN ON PLUMBING WORK?

Twenty minutes of questions about how you price plumbing work, what your jobs come in at once they close, and what keeps coming back to your desk. Nothing gets sold on that call and nothing gets proposed. If Josh can help, you'll set a longer second call.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. No pitch or proposal. Josh asks questions to find out if he can help.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.