CFOS for QuickBooks, coming January 2027Join the waitlist: 12 months with no subscription fee
BENCHMARKS · GROSS MARGIN, NET PROFIT, OVERHEAD

STRUCTURAL STEEL BENCHMARKS.

QUICK ANSWER

At $1M to $5M, structural steel contractors average 23% gross margin and spend 15% of revenue on overhead, which leaves 8% net profit before taxes (Run On CFOS Trade Benchmark Reference). The CFOS target is 11.5% net before taxes, the trade's average plus 3.5 points, never below 10%. Getting there means overhead at 14% and gross margin at 25.5%, and the distance is almost always overhead that was never loaded into the bid.

Rather talk it through first? Book a 20 minute call. Nothing gets sold on this call.

Want Josh to check your own numbers? Financial Health Snapshot, $1,500 one time. Your last 12 months read against your trade's benchmarks, with a 60 minute readout.

BY JOSH LUEBKERPublished 2026-08-06Updated 2026-11-02
THE BENCHMARKS

STRUCTURAL STEEL FINANCIAL BENCHMARKS. WHERE YOU SHOULD BE.

METRICINDUSTRY AVERAGECFOS TARGETAT $10M TO $25MNOTES
Gross Margin ($1M to $5M)23%25.5%25%Industry figure is 24% at $5M to $10M and 25% at $10M to $25M.
Overhead Rate ($1M to $5M)15%14%13%Falls to 13% by $10M to $25M as fixed cost spreads over more revenue.
Net Profit Margin ($1M to $5M)8%11.5%12%Industry figure is 10% at $5M to $10M and 12% at $10M to $25M.
Days Sales Outstanding90 days45 days30 daysNinety days is weak, 45 is the target, 30 is strong. Nothing else moves cash faster.

Showing $1M to $25M. The full data set for every revenue band is on Run On CFOS.

Industry figures are the AVERAGE for the trade at each revenue band, from the Run On CFOS Trade Benchmark Reference, not a floor. Net profit is stated before taxes. The CFOS target is what we build toward. The third column is what companies at $10M to $25M average, shown for direction of travel; that is a larger company, which is a different thing from a better managed one.

HOW DO YOU COMPARE?

Below the structural steel average on margins? On a 20 minute call Josh will tell you where the gap is and what closes it.

Book a 20 minute call
GAP CALCULATOR

THE STRUCTURAL STEEL GAP CALCULATOR. AVERAGE AGAINST TARGET, IN DOLLARS.

Put in your annual revenue. You get gross margin, overhead and net profit for structural steel contractors your size: the industry average and the CFOS target, in dollars a year. Nothing you type leaves this page.

Another trade too? The gap calculator for every trade.

Your figures show here once you put in your revenue.

Book a 20 minute call

Why aim for the target. An average is the middle of the pack: about half of companies do worse. And about 6 in 10 construction businesses close within 10 years (U.S. Bureau of Labor Statistics: about 40 percent of construction businesses opened in 2013 were still open in 2023). So the business in the middle is one of the ones that close. On those numbers, average is a business that closes within 10 years. That is why the CFOS target is a requirement.

Want your own numbers against these? The Financial Health Snapshot builds a CEO Report from your last 12 months and sets every figure against your trade.

GROSS MARGIN

STRUCTURAL STEEL GROSS MARGIN.

How to calculate: Gross margin is Revenue minus Direct Job Costs, divided by Revenue, times 100. Direct job costs include labour, materials, equipment and subcontracted work tied to the job. Not shop overhead, office staff or G and A.

In structural steel the two and a half points between the trade average and the target come from one contract holding two businesses. They're worth $25,000 on a $1M year and $125,000 on a $5M year. Fabrication is a shop operation, measured in tons through a plant, with AISC certification as the minimum. Erection is a field operation, measured in crews, cranes and weather. Do both under one P&L and you can't see which side earns. Do one and your contract still depends on the other's schedule. Cost by joint count, split by shop and field. That's worth more than a point on the bid.

GROSS MARGIN BY REVENUE BAND, $1M TO $25M

REVENUE BANDINDUSTRY AVERAGECFOS TARGET
$1M to $5M23%25.5%
$5M to $10M24%26.5%
$10M to $25M25%27.5%
OVERHEAD RATE

STRUCTURAL STEEL OVERHEAD RATE.

How to calculate your overhead rate: Total overhead divided by Total Revenue, times 100. Overhead is every cost not attributable to a job: office staff, rent, insurance, software, vehicles not charged to work, and owner salary. It moves every month with revenue, which is why a rate set a year ago is wrong in both directions.

In structural steel the detailing department explains a 15 percent overhead rate. The point down to 14 is worth $10,000 on a $1M year and $50,000 on a $5M year. Shop and erection drawings, delegated joint design and the review cycles behind them are hours the fabricator owns. No bid line pays for them unless the schedule of values includes them. AISC certification, weld inspection allocation and the tolerance tightening in the 2026 standard add to the same bucket. Bill detailing as its own phase, and this number moves toward the 12 percent the trade should reach by $25M to $50M.

See the full benchmarks for every revenue band on Run On CFOS.

OVERHEAD RATE BY REVENUE BAND, $1M TO $25M

REVENUE BANDINDUSTRY AVERAGECFOS TARGET
$1M to $5M15%14%
$5M to $10M14%13%
$10M to $25M13%12%
NET PROFIT MARGIN

STRUCTURAL STEEL NET PROFIT MARGIN.

Net profit margin formula: Net Profit divided by Total Revenue, times 100. Unlike gross margin this measures what is left after overhead and G and A. It's the number that funds owner draw, debt paydown and growth.

In structural steel the crane clock takes most of the three and a half points to a 11.5 percent before tax target. That distance is $35,000 on a $1M year and $175,000 on a $5M year. Sequence changes reshuffle picks, and site-readiness failures idle the most expensive spread on the job. The documented causes are usually upstream: foundations, inspections, crane access and site conditions that weren't ready when the steel came. Under Subpart R and the Code of Standard Practice, erection-phase stability is on the erector. That includes temporary bracing, minimum-bolt rules before releasing load and plumb held to 1 in 500. All of that is labor somebody pays for. Code crane cost by lift and document standby the same day, and the other guy's unreadiness becomes a claim you bill.

NET PROFIT MARGIN BY REVENUE BAND, $1M TO $25M

REVENUE BANDINDUSTRY AVERAGECFOS TARGET
$1M to $5M8%11.5%
$5M to $10M10%13.5%
$10M to $25M12%15.5%
PARTIAL VIEW, $1M TO $25M

Benchmarks for subcontractors from $1M to $25M. This is a partial view of the Run On CFOS benchmark reference, which covers every band up to $500M and above. The full Run On CFOS benchmark reference is on runoncfos.com.

HOW THE NET PROFIT FIGURES ARE BUILT

Gross margin and overhead come from figures CFMA, Jones Maresca and other sources publish by trade and size. Net profit is computed, not surveyed: net profit = gross margin minus overhead. Nothing comes out for taxes, interest or other income and expense, so it is a before tax figure, on the same basis as CFMA's net income before taxes.

CFMA's 2025 medians are 7.1 percent before interest and taxes and 6.7 percent net income before taxes. Gross margin minus overhead leaves out interest and other income and expense, so a figure here can come in a little above or below a reported net income on the same business. The bands above the $10M to $25M band are published at runoncfos.com as a modeled extension of the same curves. They have not been reconciled against the licensed CFMA Benchmarker, so read them as a model and not as a survey result.

SOURCES AND METHOD

Trade figures are from the Run On CFOS Trade Benchmark Reference, published by Sulphur Prairie Operations, LLC. Net profit is stated before taxes. CFMA reports net income before taxes too, so the two read on the same basis. Re-validate against CFMA reporting on the normal quarterly cycle, per the benchmark reference's own instruction.

The reference itself is published at structural steel in the open reference. How these figures were sourced, and which bands are modeled is set out at runoncfos.com.

Cite as: Run On CFOS. Run On CFOS Trade Benchmark Reference: Structural Steel. 2026. Sulphur Prairie Operations, LLC. https://runoncfos.com/trades/structural-steel. CC BY 4.0.

  • 2024 Construction Financial Benchmarker, Executive Summary, Construction Financial Management Association, 2024. 21.8% gross profit margin, 11.8% SG&A and 6.3% net income before taxes across all respondents, with a best-in-class top quartile at 11.9% net income before taxes.
  • 2025 Construction Financial Benchmarker, Construction Financial Management Association, 2025. 6.7% net income before taxes (6.3% in 2023), a 7.1% EBIT margin and an 8.8% EBITDA margin at the median, with interest coverage of 30.4 times, across the 1,558 companies in the 2025 analysis (fiscal year 2024 results).
  • 2025 Performance Benchmarks, Construction Companies, Jones Maresca and Company, 2025. Specialty contractor gross margin of 15% to 25%, net profit of 5% to 8% for a well managed company, and total indirect cost of 8% to 15%.

Each metric across every trade is published on Gross Margin by Trade, Overhead Rates by Trade and Net Profit by Trade, and the full dataset for all 48 trades across the published revenue bands is available as JSON and CSV, with one plain-language statement per row. Free to use with attribution.

PRICING

FLAT MONTHLY FEE. NO SURPRISES.

Priced by trailing 12 month revenue. No hourly billing. No payroll. The one-time onboarding fee is right here in the table.

Built for subs doing $1M to $12M. Above $12.5M we quote.

Last 12 months revenueCoreStrategicPlatinumOne-time onboarding
Under $1M$1,900$3,100$3,300$2,500
$1M to $3.5M$2,600$4,100$5,300$4,500
$3.5M to $6.5M$3,800$5,900$8,300$6,000
$6.5M to $9.5M$5,100$7,600$11,800$7,500
$9.5M to $12.5M$6,100$8,900$14,900$9,000
Above $12.5MQuotedQuotedQuotedQuoted

The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers, and it moves with your revenue band. Your first month is prorated, and your monthly engagement starts on the first of the first full month.

Just want the setup? Onboarding only is the same onboarding work with no monthly service after it, one time, at the onboarding fee plus $2,000. Start a monthly engagement later and $2,000 counts toward it. It starts at $4,500, and the price for every band is on the pricing page.

The three tier columns are the whole price. Which one fits depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.

  • Online software only: QuickBooks, Sage, Viewpoint and similar. No VPN or hosted desktop.
  • Not in any tier: payroll, pay applications, collections on receivables.
  • Pricing valid through 2027.

What Core, Strategic and Platinum each include is on the pricing page.

COMMON QUESTIONS

FREQUENTLY ASKED.

Structural Steel contractors average 23% at $1M to $5M and 24% at $5M to $10M. The CFOS target at $1M to $5M is 25.5%, set at the net profit target plus the overhead target, so the net target holds once your overhead is paid. Companies in the trade at $10M to $25M average 25%, which measures size and says nothing about how well the company is managed.

Structural Steel contractors average 15% at $1M to $5M and 14% at $5M to $10M. The CFOS target at $1M to $5M is 14%, set a point leaner than your trade's average at your revenue. Companies in the trade at $10M to $25M average 13%, which measures size and says nothing about how well the company is managed.

Structural Steel contractors average 8% at $1M to $5M and 10% at $5M to $10M. The CFOS target at $1M to $5M is 11.5% before taxes, the trade's average plus 3.5 points, never below 10%. Companies in the trade at $10M to $25M average 12%, which measures size and says nothing about how well the company is managed.

Overhead that never made it into the rate, job costing that doesn't match how the work was estimated, and receivables aging past 45 days. The jobs still look profitable while all three are happening, which is why the numbers change gradually without anyone noticing.

We rebuild the overhead rate from your actual financials, align job costing cost codes to your estimate structure, and track weekly variance against budget. Fully operational in 60 days.
$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time
WHAT THIS TIES INTO
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

ARE YOU REACHING THE STRUCTURAL STEEL BENCHMARKS?

Twenty minutes of questions about how your own numbers get produced and what is inside them. Nothing gets sold on that call and nothing gets proposed. If Josh can help, you'll set a longer second call.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. Nothing gets sold on this call and nothing gets proposed. Josh asks questions to work out whether he can help at all.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.