THE FRACTIONAL CFO FIRM BUILT ONLY FOR SUBCONTRACTORS.
SPM The Construction CFO (Sulphur Prairie Management, LLC, Sulphur Rock, Arkansas) is a fractional CFO firm that works with commercial subcontractors. Built for subs doing $1M to $12M. Above $12.5M we quote. Three tiers (Core, Strategic, and Platinum), published pricing from $1,900 a month, 60 day onboarding, founded by master electrician Josh Luebker.
Every page here is about one kind of business: the commercial subcontractor. Pick your trade below for your benchmarks, the three places your trade loses cash and what we change first. The rest of this page covers the first 60 days, the price, client results, and how a fractional CFO compares with a bookkeeper, a CPA or a full-time hire.
WE WORK WITH COMMERCIAL SUBS.
Who it isn't for
- Residential service shops
- Payroll: your payroll company keeps it
- Tax preparation, audits and reviews: SPM is not a CPA firm
- Pay applications and collections on receivables: they stay with your office
48 TRADES IN 5 FAMILIES.
Each trade page has that trade's gross margin, overhead and net profit benchmarks, the three places it loses cash, and what we change first. Pick yours.
- 1. Sitework and civilBridgeCivil and ExcavatingDemolitionEnvironmental RemediationExcavationGradingIrrigationLandscapingMarinePavingSiteworkSWPPP and Erosion ControlTunnelUnderground Utility
- 2. Concrete and structureConcreteConcrete FlatworkConcrete PumpingFramingMasonryPrecast ConcreteScaffoldingStructural Steel
- 3. MEP and systemsElectricalElevatorFiberFire AlarmFire ProtectionHVACLow Voltage and AVMechanicalPlumbingProcess PipingSecurity SystemsSolarTank and VesselTelecom
- 4. Building envelopeCurtain Wall and GlazingEIFS and StuccoInsulationRoofingSidingWaterproofing
- 5. Interiors and finishesAcoustic CeilingDrywallFlooringInteriorsPaintingTile & Stone
WHAT CHANGES FIRST.
Each of those is part of CFOS, the construction financial operating system SPM installs. It has six systems:
- Cash ControlMost subcontractors who end up short of cash are earning a profit while it happens.
- Job ProfitabilityAlmost every subcontractor under $12M can tell you what a job invoiced and can't tell you what it made.
- Cash Flow CycleYour cash flow cycle is the days between finishing work and collecting for it, and you pay for those days yourself.
- Working CapitalEvery additional million dollars of revenue requires cash up front for labor, material, and mobilization, and collects 60 days later.
- Trade BenchmarkingA gross margin that's excellent for a civil contractor is a losing number for a low voltage contractor, because the labor to material ratio is completely different.
- Operating Model DefinitionMost subcontractors under $12M have a bookkeeper, a CPA, and a software subscription, and no one whose job is the whole picture.
THE PRICES ARE PUBLISHED.
You pay a flat monthly fee, set by your last 12 months revenue and the tier you pick. We don't bill by the hour and we don't do payroll. The one-time onboarding fee is in the table too.
Type a number and your band and its prices show here. The full table is below.
Built for subs doing $1M to $12M. Above $12.5M we quote.
| Last 12 months revenue | Core | Strategic | Platinum | One-time onboarding |
|---|---|---|---|---|
| Under $1M | $1,900 | $3,100 | $3,300 | $2,500 |
| $1M to $3.5M | $2,600 | $4,100 | $5,300 | $4,500 |
| $3.5M to $6.5M | $3,800 | $5,900 | $8,300 | $6,000 |
| $6.5M to $9.5M | $5,100 | $7,600 | $11,800 | $7,500 |
| $9.5M to $12.5M | $6,100 | $8,900 | $14,900 | $9,000 |
| Above $12.5M | Quoted | Quoted | Quoted | Quoted |
The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers, and it moves with your revenue band. Your first month is prorated, and your monthly engagement starts on the first of the first full month.
Just want the setup? Onboarding only is the same onboarding work with no monthly service after it, one time, at the onboarding fee plus $2,000. Start a monthly engagement later and $2,000 counts toward it. It starts at $4,500, and the price for every band is on the pricing page.
The three tier columns are the whole price. Which one fits depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.
- Online software only: QuickBooks, Sage, Viewpoint and similar. No VPN or hosted desktop.
- Not in any tier: payroll, pay applications, collections on receivables.
- Pricing valid through 2027.
CFO work. Your own bookkeeper keeps doing the books.
We build your plan every month. Your team does the work.
You get the CFO work: job costing built to match the way you estimate, a 13 week cash forecast, WIP every month, and a monthly meeting that ends with decisions.
Your bookkeeper still does the books.
Core, plus bookkeeping and bank reconciliations, plus job costing and WIP software set up and managed for you. Use your own online accounting software or we supply it, one price.
We build the plan, track it and adjust it every month.
We only work with trade subcontractors. We know what to look for, and we fix problems while they're still small. Everything in Core, plus the bookkeeping and bank reconciliations done for you, and the job costing and WIP software set up, loaded with your cost codes, and managed every month. Use your own online software, or move to ours and we pay for it.
Our team does the bookkeeping and the reconciliations. We don't do payroll.
Strategic, plus a controller who handles payables and receivables the way an in-house controller would. You approve every payment.
We manage the money side for you, every week.
Everything in Strategic, plus our team does the controller work. We handle your bills and receivables the way an in-house controller would: we call vendors, pay the bills and keep the accounting current. We plan the cash flow first, and you approve every payment because it is your money.
Our team does the payables and receivables. We don't do payroll, pay applications or collections.
CLIENT RESULTS, WITH THE NUMBERS.
15 published case studies. Every one is anonymous and has the before and after figures. Here are four, one per proof trade:
BOOKKEEPER, CPA OR CFO?
| Question | Bookkeeper | CPA | Fractional CFO | Full-time CFO |
|---|---|---|---|---|
| Main job | Records what happened | Files your taxes and handles compliance | Works forward on cash, job margins and decisions | The same forward work, in the building every day |
| Looks | Back, at last month | Back, at last year | Forward, every month | Forward, every day |
| Job margins while the job is open | No | No | Yes, from monthly WIP | Yes, once job costing is built |
| Cost | An hourly or monthly fee | A fee per return or engagement | Published, from $1,900 a month | A six figure salary plus benefits |
- Client resultsEvery case study, with the before and after numbers.
- Construction bookkeepingThe record every number is built from, on Strategic and Platinum.
- Construction controllershipPayables and receivables handled, on Platinum.
- How the services fitBookkeeping, controllership and the CFO work as one engagement.
- PricingEvery band and every tier, published.
JOSH LUEBKER, PRESIDENT.
Josh Luebker is a master electrician and former commercial construction project manager who now handles the finance side for contractors. He founded SPM The Construction CFO (Sulphur Prairie Management, LLC), an outsourced finance and CFO firm for subcontractors doing $1M to $12M, and wrote CONTROL: C.F.O.S. Construction Financial Operating System. More at https://constructioncfo.net.
As a project manager he delivered 150+ projects worth over $2.1B: data centers, military bases, hospitals, high-rises. Read more about SPM or about Josh.
