EXCAVATION ยท JOB COSTING SOFTWARE

CONTROLQORE FOR EXCAVATION CONTRACTORS.

Generic accounting software can't report actual cost per CY against the estimated unit price, tell you which excavator is running below break even, or build the documentation for a differing site condition while the machines are still on it. ControlQore can.

QUICK ANSWER

SPM sets up ControlQore for excavation contractors with cost codes by soil classification and depth band, aligned to the estimate structure. Foremen post actual costs daily by cost code. Every week the report compares actual CY cost per day to the estimated unit price. Every month the WIP schedule is produced from actual data. Setup is complete in 30 days, and clients are fully operational in 60 days.

QuickBooks reports total labor cost by job, and total labor cost is a number you can only argue with after the fact. The cost code structure is what changes that. Cost codes built to match the excavation estimate format produce a direct actual against estimated comparison by cost category every week, so job variance is visible in week two while the machines are still on site. Cost codes built from a generic template produce blended totals that hide the same variance until closeout. Same hours, same crews, two completely different amounts of warning.

BY JOSH LUEBKERPublished 2026-08-06Updated 2026-08-07
WHAT IT SEES

THE NUMBERS GENERIC SOFTWARE MISSES.

By CY
Cost Codes by Soil Class and Depth Band
Weekly
Actual CY Cost Per Day vs. Estimated Unit Price
By Machine
Equipment Utilization Against Break-Even
Monthly
WIP Schedule From Actual Data
THE DEFINITION

WHAT IT IS.

ControlQore is construction job costing and WIP reporting software for commercial subcontractors at $1M to $12M that posts cost daily by cost code, so an excavation contractor can read actual cost per CY against the estimated unit price in week two of a job instead of at closeout.

Job variance is visible in week two. ControlQore setup is complete in 30 days and the system is fully operational in 60 days. Owner time after that runs about 5 hours a month, because SPM builds it, runs it, and brings you the decisions rather than the software.

WHAT YOU ARE DEALING WITH

WHERE IT GOES WRONG.

01

Total Labor Cost, No Cost Per CY

QuickBooks reports total labor cost by job, which tells you what you spent without telling you what it bought. An excavation bid is priced by the cubic yard, so the only comparison that counts is actual cost per CY against the estimated unit price on that cost code. Without it, the first honest read on a job comes at closeout, and by then the dirt is moved and the crew is on the next site.

02

Cost Codes Built From a Generic Template

The cost code structure is the whole foundation, and a generic template is where it breaks. When a foreman posts hours to a bucket nobody bid against, the result is a blended total that hides variance until the job is closed. Cost codes built to match the excavation estimate format produce a direct actual against estimated comparison by cost category weekly, which is the same data organized so it can be used while the job is still running.

03

Equipment Cost With No Utilization Number

Excavators, dozers, and compactors are the largest fixed cost in an excavation company, and most of the time they sit inside overhead as one lump. Without a cost code per machine, nobody can compare actual billable hours to available hours, so nobody knows the utilization rate. A machine running below break even keeps costing money every month it goes unmeasured, and the decision to find work for it, rent it out, or sell it never gets made.

04

Changed Conditions With No Documentation Package

Most excavation contracts have differing site conditions clauses, which means the money is available when the soil doesn't match the geotechnical report. Getting it requires a comparison against the geotech, machine logs, the production rate impact, and a cost proposal, assembled while the condition is still in front of the crew. Without a system holding the cost detail, that turns into a conversation with the GC instead of a change order.

HOW SPM SETS IT UP

WHAT WE BUILD.

Cost Codes by CY in ControlQore

SPM builds excavation cost codes for topsoil stripping, common excavation by depth, rock excavation, and structural excavation by structure type. Each cost code maps to the corresponding category in the excavation estimate. When a foreman posts hours, they hit the same bucket that was used in the bid, so actual against estimated is a direct comparison rather than a reconciliation project.

Weekly Variance Review

Every week, actual CY cost per day is compared to the estimated unit price. When any cost code runs more than 10% over estimated cost for two consecutive weeks, SPM flags it. The cause is identifiable in the cost code detail, so the conversation starts with what's driving it instead of whether it's happening. If a change order applies, SPM builds it and submits it.

Equipment Cost Codes by Machine

Each excavator, dozer, and compactor is tracked to its own ControlQore cost code. Monthly, actual billable hours against available hours produces the utilization rate for that machine. Equipment below break even triggers a decision: find work for it, rent it out, or sell it. That decision gets made on a number and not on how busy the yard feels.

Changed Condition Documentation Within 48 Hours

When soil conditions differ from the geotechnical report, SPM builds the documentation package: the geotech comparison, the machine logs, the production rate impact, and the cost proposal, all within 48 hours. Most excavation contracts have differing site conditions clauses, so the claim is usually a documentation problem rather than an entitlement problem. Filed while the condition is still open, it gets paid.

WHAT YOU GET

THE OUTPUTS, LISTED.

You get a monthly WIP schedule built from actual ControlQore data. It carries cost-to-cost percentage complete by job, overbilled and underbilled positions, and projected final margin updated from the actual cost trajectory, so it's ready for a bonding or banking conversation without any rework.
You get a job-level P&L by cost code. Every active job reports actual gross margin against estimated, and every completed job reports actual against estimated at closeout, which is how future excavation estimates get calibrated on your own history.
You get a 13 week cash flow forecast. Every cash outflow and inflow is mapped 13 weeks forward, so a cash shortfall becomes visible 8 weeks before it hits.
You get an AR aging and collections report. Every invoice over 30 days is flagged and collections calls are made every Monday. Most clients have $50,000 to $200,000 in earned AR cleared in the first 30 days of engagement.
$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time
PRICING

FLAT MONTHLY FEE. NO SOFTWARE INVOICE.

Three tiers, priced by your trailing twelve month revenue. ControlQore comes with Strategic, and it never appears as its own line item on an SPM invoice. Which tier you're in depends on how much of the work you want off your desk.

Last 12 months revenueMonthly fee
Up to $1M$1,900 to $2,900
$1M to $3.5M$2,600 to $3,900
$3.5M to $6.5M$3,800 to $5,700
$6.5M to $9.5M$5,100 to $7,100
$9.5M to $12.5M$6,100 to $8,500
$12.5M to $15.5M$7,400 to $11,000
$15.5M to $18.5M$9,400 to $13,500
$18.5M+Quoted individually

Range reflects the three tiers below. Which one you're in depends on how much of the work you want off your desk. No payroll. No hidden line items.

Core

You stop guessing.

You get the CFO work. Job costing built against the way you estimate, a 13 week cash forecast, monthly WIP, and a meeting every month that ends in decisions rather than a report.

Your bookkeeper keeps doing the books.

Executive

You stop touching the books.

Everything in Core, and we run the bookkeeping and the controllership as well. Nobody in your office is answering coding questions or chasing a reconciliation at month end.

We do the books. No payroll.

Strategic

Every job shows its margin while it's still running.

Everything in Executive, plus the job costing and WIP platform set up, loaded with your cost codes, and managed for you every month. You never have to learn it.

We do the job costing.

COMMON QUESTIONS

FREQUENTLY ASKED.

SPM builds ControlQore cost codes aligned to the excavation estimate structure, meaning cost codes by soil classification and depth band. Foremen post actual costs daily by cost code. Every week, actual CY cost per day is compared to the estimated unit price. Every month, the WIP schedule is produced from actual data. The owner sees job-level profitability in week two rather than at closeout.
Cost codes for excavation contractors include topsoil stripping, common excavation by depth, rock excavation, and structural excavation by structure type. Each cost code maps to the corresponding category in the estimate, so the actual against estimated comparison is direct and weekly. Equipment gets its own cost code per machine, which is how utilization against break even becomes a monthly number.
Yes. SPM migrates all clients from QuickBooks to ControlQore at engagement start. ControlQore covers all of the accounting functions plus the construction-specific job costing and WIP reporting that QuickBooks can't do at the depth commercial subcontractors need.
Three tiers, and which one you are in depends on how much of the work you want off your desk. Core is where you stop guessing: job costing built against the way you estimate, a 13 week cash forecast, monthly WIP, and a monthly meeting that ends in decisions, while your bookkeeper keeps doing the books. Executive is where you stop touching the books, because we run the bookkeeping and the controllership as well. Strategic is where every job shows its margin while it is still running, because the job costing and WIP platform is set up and managed for you. No payroll. No scope gaps.
WHAT THIS TIES INTO
Josh Luebker, The Construction CFO
Josh Luebker
FRACTIONAL CFO · THE CONSTRUCTION CFO

Former commercial project manager and master electrician: 150+ projects worth $2.1B combined, from $50,000 to $300M. Now fractional CFO to commercial subcontractors.

READY TO FIX THE NUMBERS?

A 20 minute call takes 20 minutes. Bring your last P&L and your current bank balance, and we will show you what the excavation cost codes would look like and where the current numbers are wrong before anybody talks about working together.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute diagnostic

20 minutes. No sales pressure. We will tell you exactly what's broken before we talk about anything else.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.