CFOS for QuickBooks, coming January 2027Join the waitlist: 12 months with no subscription fee
TRADE SERVICE · MARINE & SPECIALTY CLUSTER

FRACTIONAL CFO FOR MARINE CONTRACTORS.

QUICK ANSWER

We manage the finance side for marine subcontractors doing $1M to $12M. You get job costing aligned to the way you estimate, a 13 week cash flow forecast, monthly WIP, and a CFO in the room every month. Pricing starts at $1,900 per month.

Marine has a floating spread that bills by the day, good weather or bad. So spread-day rates and a weather-standby cost code are the first two things we build. A barge, crane and tug idle through a blow cost the same as working ones. That's equipment utilization at ten times the stakes of a dirt job. We put mobilization and demobilization on their own schedule-of-values lines. Getting a spread to site through tug transit, tow permits, crane rigging and spud setup costs six figures on real jobs. Then the permit calendar becomes the cash calendar. USACE Section 404, state Section 401 and environmental work windows decide when the spread can work at all.

BY JOSH LUEBKERPublished 2026-08-06Updated 2026-11-02
WHERE MARINE LOSES MONEY

THE THREE THINGS THAT DRAIN THE CASH.

LEAK 01

The Spread That Never Sleeps

Barges, cranes and tugs bill by the day, good weather or bad. That's why marine overhead is 15 percent at the small end. Spread-day rates and weather-standby cost codes are your equipment utilization, at ten times the stakes.

LEAK 02

The Window

USACE permits, environmental windows and tide tables decide when the work happens. You decide only whether the cash plan matches. Competition in the peak window can move bids 10 to 25 percent.

LEAK 03

The Sub-Tier Maze

Under a prime on federal or port work, lien rights become Miller Act bond rights, the deadlines change and flow-downs govern. A $25M marine GC works on systems, because at marine scale the paperwork is the cash.

THE MATH

FROM 7% TO 10.5% NET.

At $1M to $5M, the average marine sub earns 22% gross margin and spends 15% of revenue on overhead. What's left is 7% net profit before taxes (Run On CFOS Trade Benchmark Reference). The CFOS target is 10.5% before taxes. That is the marine average plus 3.5 points, and never below 10%. The book CONTROL's 12% is the rule of thumb across trades. It is not the industry average.

Two changes get you to the target. Overhead comes down 1 point to 14%, and gross margin comes up 2.5 points to 24.5%, so 24.5 minus 14 leaves 10.5. The gross margin points come from the three problems above, once you price them and bill for them. On a $3M year, every point is $30,000.

HOW SPM FIXES IT

WHAT WE CHANGE.

These are the marine problems we put a number on first. Each one gets its own cost code, its own line on the schedule of values or its own line in the 13 week cash forecast, so you can read it in the monthly meeting while the job is still open.

GAP CALCULATOR

THE MARINE GAP CALCULATOR. AVERAGE AGAINST TARGET, IN DOLLARS.

Put in your annual revenue. You get gross margin, overhead and net profit for marine contractors your size: the industry average and the CFOS target, in dollars a year. Nothing you type leaves this page.

Another trade too? The gap calculator for every trade.

Your figures show here once you put in your revenue.

Book a 20 minute call

Why aim for the target. An average is the middle of the pack: about half of companies do worse. And about 6 in 10 construction businesses close within 10 years (U.S. Bureau of Labor Statistics: about 40 percent of construction businesses opened in 2013 were still open in 2023). So the business in the middle is one of the ones that close. On those numbers, average is a business that closes within 10 years. That is why the CFOS target is a requirement.

Want your own numbers against these? The Financial Health Snapshot builds a CEO Report from your last 12 months and sets every figure against your trade.

PRICING

YOU PAY ONE FLAT MONTHLY FEE.

The fee is set by your trailing 12 month revenue. We don't bill by the hour and we don't do payroll. The one-time onboarding fee is in the table too.

Type a number and your band and its prices show here. The full table is below.

Built for subs doing $1M to $12M. Above $12.5M we quote.

Last 12 months revenueCoreStrategicPlatinumOne-time onboarding
Under $1M$1,900$3,100$3,300$2,500
$1M to $3.5M$2,600$4,100$5,300$4,500
$3.5M to $6.5M$3,800$5,900$8,300$6,000
$6.5M to $9.5M$5,100$7,600$11,800$7,500
$9.5M to $12.5M$6,100$8,900$14,900$9,000
Above $12.5MQuotedQuotedQuotedQuoted

The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers, and it moves with your revenue band. Your first month is prorated, and your monthly engagement starts on the first of the first full month.

Just want the setup? Onboarding only is the same onboarding work with no monthly service after it, one time, at the onboarding fee plus $2,000. Start a monthly engagement later and $2,000 counts toward it. It starts at $4,500, and the price for every band is on the pricing page.

The three tier columns are the whole price. Which one fits depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.

  • Online software only: QuickBooks, Sage, Viewpoint and similar. No VPN or hosted desktop.
  • Not in any tier: payroll, pay applications, collections on receivables.
  • Pricing valid through 2027.

What Core, Strategic and Platinum each include is on the pricing page.

COMMON QUESTIONS

FREQUENTLY ASKED.

Marine contractors at $1M to $5M net 7 percent on average, rising to 14 percent by $25M to $50M; the CFOS net profit target is 10.5 percent before taxes at $1M to $5M, the trade average plus 3.5 points. Marine earns 22 percent gross, one of the stronger margins next to earthwork. Then 15 percent overhead takes much of it back, so allocating spread cost is the main job. Every net profit figure here is gross margin minus overhead, stated before taxes, the same basis CFMA reports net income on.

See the full benchmarks for every revenue band on Run On CFOS.

Usually it needs the CFO work, and a full time CFO is more than it needs. At $5M to $10M, marine subs average 9% net profit before taxes (Run On CFOS Trade Benchmark Reference), and the CFOS target is 12.5%. On $5M of revenue every point is $50,000, so that difference is worth $175,000 a year. A full time CFO costs $150,000 or more in salary alone. SPM's published price for $3.5M to $6.5M is $3,800 a month for Core to $8,300 for Platinum.

Because the equipment floats. Barges, cranes, tugs, spuds and workboats cost money every day, work or no work, and the maintenance is saltwater grade. Put a spread-day cost rate in every bid and you pay for the 15 percent on purpose. Leave it out and it's a surprise.

They own the calendar. Environmental windows, tides and sea states decide when the spread works. Permits decide when the job can start. Peak-window competition can move bids 10 to 25 percent. Your cash plan has to pay for the spread through the standby days the window forces.

On federal projects you have no lien rights against the government. The Miller Act payment bond replaces them, with notice and suit deadlines that differ from state lien law. Calendar the bond deadlines when you sign, review every flow-down clause and keep certified payroll clean. On this work, the paperwork is how you get paid.

As its own front-loaded schedule-of-values line, with demobilization as a separate line at the end. Towing a spread to site costs six figures on real work. Fold it into unit prices and you finance the job for the owner. If the job is canceled or suspended, that money is gone.

Spread-day costs by vessel, weather standby kept apart from productive time, mob and demob as their own codes, and permit-gated milestones on the cash forecast. A verified $25M marine GC works on that setup. At marine day rates, untracked time costs the most.

A bookkeeper records history. Spread-day rates, weather-standby codes, Miller Act deadlines and permit-gated cash planning are controls, and that's CFO work. SPM does that CFO work for marine contractors.

Three tiers, and which one you are in depends on how much of the work you want off your desk. On Core we build your plan every month and your team does the work: job costing built against the way you estimate, a 13 week cash forecast, monthly WIP, and a monthly meeting that ends in decisions, while your bookkeeper keeps doing the books. On Strategic we build the plan, track it and adjust it every month: our team does the bookkeeping and the bank reconciliations, and the job costing and WIP software is set up and managed for you, on your own online software or ours. On Platinum we manage the money side for you every week: our team handles your bills and receivables the way an in-house controller would, and you approve every payment. We don't do payroll.

Sixty days. We migrate your books back to the start of your last taxable year and build your job costing structure from scratch, and on Strategic and Platinum we set up the job costing and WIP software too. You're fully up and working in two months. The onboarding fee is one time, the same for every tier, and set by your revenue band.

ControlQore is the job costing and WIP platform we use on the Strategic and Platinum tiers. It's built for contractors, costs less than the older tools, and has AI built in. We set it up and manage it, so you do not have to learn it. Core is the CFO work only, so it does not include the software.

A bookkeeper records what happened. We tell you what it means and what to do about it. We align job costing to your estimates, track WIP monthly, and hold a monthly meeting where you decide what to fix and who fixes it.
$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time

How marine CFO firms compare: the marine firm study, with every score and its source.

OTHER SITEWORK AND CIVIL TRADES

Marine is one of 14 trades in the sitework and civil family on our CFO for subcontractors page. Nearby trades with their own page:

WHAT THIS TIES INTO
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

THE CHEAPER OPTION WORKS AND TAKES LONGER.

If price comes first, plenty of CFOs and bookkeepers can get your construction company results. It often takes the better part of a year.

If you're a trade contractor, a sub or a GC who wins work, keeps the crews busy and still can't figure out where the money goes, we get in the weeds with you. We change the processes that cost you money on every job, build the ones you're missing and give you the formula, so you see results in 60 to 90 days.

Our guarantee holds when you come to every meeting, do the process and keep a strong pipeline of work. We can fix how your work pays. We can't fix having no work.

DO YOU KNOW YOUR TRUE MARGIN ON MARINE WORK?

Twenty minutes of questions about how you price marine work, what your jobs come in at once they close, and what keeps coming back to your desk. Nothing gets sold on that call and nothing gets proposed. If Josh can help, you'll set a longer second call.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. No pitch or proposal. Josh asks questions to find out if he can help.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.