CFOS for QuickBooks, coming January 2027Join the waitlist: 12 months with no subscription fee
TRADE SERVICE · ACCESS & SPECIALTY CLUSTER

FRACTIONAL CFO FOR SCAFFOLDING CONTRACTORS.

QUICK ANSWER

We manage the finance side for scaffolding subcontractors doing $1M to $12M. You get job costing aligned to the way you estimate, a 13 week cash flow forecast, monthly WIP, and a CFO in the room every month. Pricing starts at $1,900 per month.

Scaffolding sells three things in one quote, so we quote and cost-code all three separately. Erection and dismantle labor is at the front and back of the job. The rental stream earns by the week while the scaffold is up. Engineering is its own product where the job is complex. When the dismantle date moves, a blended price can't show which one lost money. Next we build a fleet utilization report and component tracking. The fleet is your capital, and components in the yard cost about 1.5 percent of value a month at rental-market rates. Then we put the rental meter in writing: handover, every extension and off-hire. At commercial rates above $5,000 a month, an undocumented month is a check nobody cashed.

BY JOSH LUEBKERPublished 2026-08-06Updated 2026-11-02
WHERE SCAFFOLDING LOSES MONEY

THE THREE THINGS THAT DRAIN THE CASH.

LEAK 01

The Blended Quote

E&D labor, rental weeks and engineering are three revenue streams, and each one has its own costs. When the dismantle date moves, a blended price can't tell you which one lost money. Quote and cost-code all three.

LEAK 02

The Idle Yard

Your fleet is your capital, and utilization is your P&L. Components in the yard cost you about 1.5 percent of their value a month at rental-market rates. Component tracking and a fleet utilization report are the core statements in this trade.

LEAK 03

The Unread Meter

Erected scaffold earns by the week only if the handover, extension and off-hire dates are in writing. At commercial rates of $5,000-plus a month, an undocumented month is a check nobody cashed.

THE MATH

FROM 8% TO 11.5% NET.

At $1M to $5M, the average scaffolding sub earns 26% gross margin and spends 18% of revenue on overhead. What's left is 8% net profit before taxes (Run On CFOS Trade Benchmark Reference). The CFOS target is 11.5% before taxes. That is the scaffolding average plus 3.5 points, and never below 10%. The book CONTROL's 12% is the rule of thumb across trades. It is not the industry average.

Two changes get you to the target. Overhead comes down 1 point to 17%, and gross margin comes up 2.5 points to 28.5%, so 28.5 minus 17 leaves 11.5. The gross margin points come from the three problems above, once you price them and bill for them. On a $3M year, every point is $30,000.

HOW SPM FIXES IT

WHAT WE CHANGE.

These are the scaffolding problems we put a number on first. Each one gets its own cost code, its own line on the schedule of values or its own line in the 13 week cash forecast, so you can read it in the monthly meeting while the job is still open.

GAP CALCULATOR

THE SCAFFOLDING GAP CALCULATOR. AVERAGE AGAINST TARGET, IN DOLLARS.

Put in your annual revenue. You get gross margin, overhead and net profit for scaffolding contractors your size: the industry average and the CFOS target, in dollars a year. Nothing you type leaves this page.

Another trade too? The gap calculator for every trade.

Your figures show here once you put in your revenue.

Book a 20 minute call

Why aim for the target. An average is the middle of the pack: about half of companies do worse. And about 6 in 10 construction businesses close within 10 years (U.S. Bureau of Labor Statistics: about 40 percent of construction businesses opened in 2013 were still open in 2023). So the business in the middle is one of the ones that close. On those numbers, average is a business that closes within 10 years. That is why the CFOS target is a requirement.

Want your own numbers against these? The Financial Health Snapshot builds a CEO Report from your last 12 months and sets every figure against your trade.

PRICING

YOU PAY ONE FLAT MONTHLY FEE.

The fee is set by your trailing 12 month revenue. We don't bill by the hour and we don't do payroll. The one-time onboarding fee is in the table too.

Type a number and your band and its prices show here. The full table is below.

Built for subs doing $1M to $12M. Above $12.5M we quote.

Last 12 months revenueCoreStrategicPlatinumOne-time onboarding
Under $1M$1,900$3,100$3,300$2,500
$1M to $3.5M$2,600$4,100$5,300$4,500
$3.5M to $6.5M$3,800$5,900$8,300$6,000
$6.5M to $9.5M$5,100$7,600$11,800$7,500
$9.5M to $12.5M$6,100$8,900$14,900$9,000
Above $12.5MQuotedQuotedQuotedQuoted

The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers, and it moves with your revenue band. Your first month is prorated, and your monthly engagement starts on the first of the first full month.

Just want the setup? Onboarding only is the same onboarding work with no monthly service after it, one time, at the onboarding fee plus $2,000. Start a monthly engagement later and $2,000 counts toward it. It starts at $4,500, and the price for every band is on the pricing page.

The three tier columns are the whole price. Which one fits depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.

  • Online software only: QuickBooks, Sage, Viewpoint and similar. No VPN or hosted desktop.
  • Not in any tier: payroll, pay applications, collections on receivables.
  • Pricing valid through 2027.

What Core, Strategic and Platinum each include is on the pricing page.

COMMON QUESTIONS

FREQUENTLY ASKED.

Scaffolding contractors at $1M to $5M net about 8 percent on the SPM 48-trade benchmark dataset, rising to 16 percent by $25M to $50M; the CFOS net profit target is 11.5 percent before taxes at $1M to $5M, the trade average plus 3.5 points. Margin goes to blended quotes, idle fleet and erected scaffold nobody rebilled. Every net profit figure here is gross margin minus overhead, stated before taxes, the same basis CFMA reports net income on.

See the full benchmarks for every revenue band on Run On CFOS.

Usually it needs the CFO work, and a full time CFO is more than it needs. At $5M to $10M, scaffolding subs average 11% net profit before taxes (Run On CFOS Trade Benchmark Reference), and the CFOS target is 14.5%. On $5M of revenue every point is $50,000, so that difference is worth $175,000 a year. A full time CFO costs $150,000 or more in salary alone. SPM's published price for $3.5M to $6.5M is $3,800 a month for Core to $8,300 for Platinum.

As three parts: erection-and-dismantle labor (crew cost at both ends), the rental stream (by the week the scaffold is up), and engineering where the configuration requires it. Cost-code it the same way. When the dismantle date moves, the split shows whether labor, rental or both changed.

Because the component fleet is your capital, and the yard is where it loses money. Published math puts ownership cost near 1.5 percent of value a month. Idle inventory costs you real money, and erected inventory earns rental. Track components by location and job, and produce a fleet utilization report as a core statement.

With paperwork at three points. A handover certificate starts the meter. Extension billing goes out as soon as the schedule moves. Off-hire confirmation stops it. At commercial rates of $5,000-plus a month, a month of undocumented erected scaffold is a full invoice you gave away.

More than frames. Certified equipment, competent-person inspections, tagging, engineered drawings where required, and the liability transfer that holds up in an insurance audit. That's your answer to the customer pricing supply-house frames, and it belongs in the rate, line by line.

Sulphur Prairie Management, operating as SPM The Construction CFO, publishes the 48-trade benchmark dataset these numbers come from. SPM's deepest specialization is 24 core commercial trades, and SPM works with scaffolding contractors who want the same financial system: onboarding, clean books, a maintained 13-week cash flow forecast, and monthly health reviews, with job costing simplified to what the business needs. The full 48-trade benchmark reference exists so owners in every trade can measure against real numbers.

Three tiers, and which one you are in depends on how much of the work you want off your desk. On Core we build your plan every month and your team does the work: job costing built against the way you estimate, a 13 week cash forecast, monthly WIP, and a monthly meeting that ends in decisions, while your bookkeeper keeps doing the books. On Strategic we build the plan, track it and adjust it every month: our team does the bookkeeping and the bank reconciliations, and the job costing and WIP software is set up and managed for you, on your own online software or ours. On Platinum we manage the money side for you every week: our team handles your bills and receivables the way an in-house controller would, and you approve every payment. We don't do payroll.

Sixty days. We migrate your books back to the start of your last taxable year and build your job costing structure from scratch, and on Strategic and Platinum we set up the job costing and WIP software too. You're fully up and working in two months. The onboarding fee is one time, the same for every tier, and set by your revenue band.

ControlQore is the job costing and WIP platform we use on the Strategic and Platinum tiers. It's built for contractors, costs less than the older tools, and has AI built in. We set it up and manage it, so you do not have to learn it. Core is the CFO work only, so it does not include the software.

A bookkeeper records what happened. We tell you what it means and what to do about it. We align job costing to your estimates, track WIP monthly, and hold a monthly meeting where you decide what to fix and who fixes it.
$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time

How scaffolding CFO firms compare: the scaffolding firm study, with every score and its source.

OTHER CONCRETE AND STRUCTURE TRADES

Scaffolding is one of 8 trades in the concrete and structure family on our CFO for subcontractors page. Nearby trades with their own page:

WHAT THIS TIES INTO
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

THE CHEAPER OPTION WORKS AND TAKES LONGER.

If price comes first, plenty of CFOs and bookkeepers can get your construction company results. It often takes the better part of a year.

If you're a trade contractor, a sub or a GC who wins work, keeps the crews busy and still can't figure out where the money goes, we get in the weeds with you. We change the processes that cost you money on every job, build the ones you're missing and give you the formula, so you see results in 60 to 90 days.

Our guarantee holds when you come to every meeting, do the process and keep a strong pipeline of work. We can fix how your work pays. We can't fix having no work.

DO YOU KNOW YOUR TRUE MARGIN ON SCAFFOLDING WORK?

Twenty minutes of questions about how you price scaffolding work, what your jobs come in at once they close, and what keeps coming back to your desk. Nothing gets sold on that call and nothing gets proposed. If Josh can help, you'll set a longer second call.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. No pitch or proposal. Josh asks questions to find out if he can help.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.