PODCAST APPEARANCE

PROFITABLE ON PAPER, OUT OF CASH IN PRACTICE.

AJ Waters had Josh on TheEngiNerdLife to work through the question every owner in this trade eventually asks out loud: the jobs look profitable, the year looks decent, and the bank account disagrees with both. Two client stories, including a company scaling fast and weeks away from missing payroll, then the four financial figures an owner should track and the order to read them in.

Aug 202635minHOST: AJ WATERS

$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time
EVERYTHING IT POINTS AT

THE TOOLS FROM THE CONVERSATION, IN ONE PLACE.

Nothing below is held back and none of it needs the episode. If you heard something you wanted to try on Monday, this is where it lives.

The forecast, which is most of the first half

The method costs nothing and ispublished in full: receipts dated on how each general contractor really pays you, and a floor that warns you before a short week reaches payroll. The13-week cash flow forecast template is the same method with the math already wired in, $49 once, and it includes the overhead calculator in the same workbook.

The overhead rate, which is where the margin went

Most subcontractors bid ten percent and operate at between twenty five and forty two. The method is written out, and the equipment cost basis calculator is the piece people miss, because equipment charged at a rate somebody guessed at puts the floor under every bid in the wrong place.

Billing what you already earned

The fastest cash in a construction business is work you performed and never invoiced. The SOV and Pay Application template and the G702 and G703 pair are on one page, and the WIP schedule template is the one your bank or surety reads first.

Your own trade's numbers

The conversation gets to what good looks like, and an industry-wide figure describes nobody. Gross margin, overhead and net profit for 48 trades across 7 revenue bands are published with the source cited on every figure. Read your own row.

The monthly numbers, and the order to read them in

The second half of the episode is the owner's monthly view. The six part video series covers the same material with the math on screen, and part six is the one on this: Reading the Red Flags While You Can Still Fix Them. If a term in it was unfamiliar, the construction finance glossary defines each one in a sentence.

QUESTIONS

Where can I listen to the TheEngiNerdLife Podcast episode with Josh Luebker?

On Apple Podcasts, Amazon Music, Spotify. It lasts 35min and it was released Aug 2026. Every link is at the top of this page and they all go to AJ Waters's own feed and not to a copy hosted here.

What is the 13 week cash flow forecast Josh talks about?

A rolling weekly view of money in and money out, dated on when each general contractor really pays you and not on contract terms. The written method costs nothing and is published in full. The workbook that does the math is $49 once.

What overhead rate should a subcontractor operate at?

Yours, calculated from your own expenses, and it is almost never the ten percent most contractors bid. The benchmark table on this site publishes the real average for 48 trades across 7 revenue bands with the source cited on every figure, so you can read your own row and not a number somebody quoted at a trade meeting.

Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

HEARD IT AND WANT YOUR OWN NUMBERS LOOKED AT?

Twenty minutes, no charge. Josh will tell you whether your problem is timing, pricing or the jobs themselves, and those have three different fixes. He will say so either way.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. Nothing gets sold on this call and nothing gets proposed. Josh asks questions to work out whether he can help at all.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.