CFOS for QuickBooks, coming January 2027Join the waitlist: 12 months with no subscription fee
TRADE SERVICE · CONCRETE & MASONRY CLUSTER

FRACTIONAL CFO FOR CONCRETE FLATWORK CONTRACTORS.

QUICK ANSWER

We manage the finance side for concrete flatwork subcontractors doing $1M to $12M. You get job costing aligned to the way you estimate, a 13 week cash flow forecast, monthly WIP, and a CFO in the room every month. Pricing starts at $1,900 per month.

Flatwork sells a tolerance, so the CFO work starts by pricing one. Conventional, flat, very flat and superflat are four production systems with four different costs. Sell F numbers without pricing F numbers and you give away the difference between a bull float and a laser screed. We code the finishing window separately from placement. The slab sets when the chemistry says so, and the overtime after that is this trade's biggest cost, lost in a blended rate on most jobs. We also put the ASTM E1155 test on the schedule as a billable event. Flatness measured within 72 hours of final troweling is the slab as placed. Anything later is whatever the building did to it.

BY JOSH LUEBKERPublished 2026-08-06Updated 2026-11-14
WHERE CONCRETE FLATWORK LOSES MONEY

THE THREE THINGS THAT DRAIN THE CASH.

LEAK 01

The 72-Hour Window

FF/FL numbers measured within 72 hours of troweling show the slab as placed. Anything measured later shows the slab as abused. Commission and bill the timely test and you have the acceptance record. Skip it and you're on the hook for whatever the building does to the slab.

LEAK 02

The Tolerance Tier

Conventional, flat, very flat and superflat are each a different production system with a different cost. Sell F-numbers without pricing them and you give away the difference between a bull float and a laser screed.

LEAK 03

The Finishing Clock

The slab sets when the chemistry says so, and the crew stays until it's done. Code finishing-window labor in a blended rate and you never see this trade's biggest overtime cost, job after job.

THE MATH

FROM 8% TO 11.5% NET.

At $1M to $5M, the average concrete flatwork sub earns 22% gross margin and spends 14% of revenue on overhead. What's left is 8% net profit before taxes (Run On CFOS Trade Benchmark Reference). The CFOS target is 11.5% before taxes. That is the concrete flatwork average plus 3.5 points, and never below 10%. The book CONTROL's 12% is the rule of thumb across trades. It is not the industry average.

Two changes get you to the target. Overhead comes down 1 point to 13%, and gross margin comes up 2.5 points to 24.5%, so 24.5 minus 13 leaves 11.5. The gross margin points come from the three problems above, once you price them and bill for them. On a $3M year, every point is $30,000.

HOW SPM FIXES IT

WHAT WE CHANGE.

These are the concrete flatwork problems we put a number on first. Each one gets its own cost code, its own line on the schedule of values or its own line in the 13 week cash forecast, so you can read it in the monthly meeting while the job is still open.

GAP CALCULATOR

THE CONCRETE FLATWORK GAP CALCULATOR. AVERAGE AGAINST TARGET, IN DOLLARS.

Put in your annual revenue. You get gross margin, overhead and net profit for concrete flatwork contractors your size: the industry average and the CFOS target, in dollars a year. Nothing you type leaves this page.

Another trade too? The gap calculator for every trade.

Your figures show here once you put in your revenue.

Book a 20 minute call

Why aim for the target. An average is the middle of the pack: about half of companies do worse. And about 6 in 10 construction businesses close within 10 years (U.S. Bureau of Labor Statistics: about 40 percent of construction businesses opened in 2013 were still open in 2023). So the business in the middle is one of the ones that close. On those numbers, average is a business that closes within 10 years. That is why the CFOS target is a requirement.

Want your own numbers against these? The Financial Health Snapshot builds a CEO Report from your last 12 months and sets every figure against your trade.

PRICING

YOU PAY ONE FLAT MONTHLY FEE.

The fee is set by your trailing 12 month revenue. We don't bill by the hour and we don't do payroll. The one-time onboarding fee is in the table too.

Type a number and your band and its prices show here. The full table is below.

Built for subs doing $1M to $12M. Above $12.5M we quote.

Last 12 months revenueCoreStrategicPlatinumOne-time onboarding
Under $1M$1,900$3,100$3,300$2,500
$1M to $3.5M$2,600$4,100$5,300$4,500
$3.5M to $6.5M$3,800$5,900$8,300$6,000
$6.5M to $9.5M$5,100$7,600$11,800$7,500
$9.5M to $12.5M$6,100$8,900$14,900$9,000
Above $12.5MQuotedQuotedQuotedQuoted

The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers, and it moves with your revenue band. Your first month is prorated, and your monthly engagement starts on the first of the first full month.

Just want the setup? Onboarding only is the same onboarding work with no monthly service after it, one time, at the onboarding fee plus $2,000. Start a monthly engagement later and $2,000 counts toward it. It starts at $4,500, and the price for every band is on the pricing page.

The three tier columns are the whole price. Which one fits depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.

  • Online software only: QuickBooks, Sage, Viewpoint and similar. No VPN or hosted desktop.
  • Not in any tier: payroll, pay applications, collections on receivables.
  • Pricing valid through 2027.

What Core, Strategic and Platinum each include is on the pricing page.

Prevailing wage note: Concrete Flatwork work often comes from public bids. On those jobs, certified payroll and wage classifications have to match the job cost record. ControlQore keeps the classification with the cost code, so the certified report and the job cost report come from the same data. Your office stops typing the same numbers twice every week.

COMMON QUESTIONS

FREQUENTLY ASKED.

Flatwork contractors at $1M to $5M net 8 percent on average, rising to 14 percent by $25M to $50M; the CFOS net profit target is 11.5 percent before taxes at $1M to $5M, the trade average plus 3.5 points. The money goes to tolerance work sold at conventional prices, finishing-window overtime you can't see in blended rates, and flatness disputes lost because nobody did a 72-hour test. Every net profit figure here is gross margin minus overhead, stated before taxes, the same basis CFMA reports net income on.

See the full benchmarks for every revenue band on Run On CFOS.

Usually it needs the CFO work, and a full time CFO is more than it needs. At $5M to $10M, concrete flatwork subs average 10% net profit before taxes (Run On CFOS Trade Benchmark Reference), and the CFOS target is 13.5%. On $5M of revenue every point is $50,000, so that difference is worth $175,000 a year. A full time CFO costs $150,000 or more in salary alone. SPM's published price for $3.5M to $6.5M is $3,800 a month for Core to $8,300 for Platinum.

FF measures flatness (short-range bumps over roughly 2-foot intervals). FL measures levelness (slope over roughly 10-foot intervals). Both are computed under ASTM E1155 from profiler readings. A floor can be smooth but tilted (high FF, low FL). Specs state both, often with minimum local values, so a passing average can't cover up a failing corner.

The 72-hour rule usually decides it. ASTM E1155 requires measurement within 72 hours of final troweling, before loads and partitions distort the slab. A timely, documented test is the finisher's acceptance record. A late test measures what the building did to the slab after placement. Commission the test, bill it as a line item and keep the report.

By the specified F-numbers. FF-50-plus floors for AGVs and defined-traffic aisles need laser screeds, restraightening and narrow-strip placement. The tolerance is the product tier. Price a superflat spec like conventional flat and you give away the hardest work in the trade.

Because finishing follows the concrete's set time. The crew stays until the surface is done, at whatever hour the chemistry says. Code finishing-window labor separately from placement labor. Track it against mix, weather and admixtures, and put that overtime in your price so you stop paying for it yourself.

A bookkeeper records history. F-number pricing tiers, 72-hour test protocols, finishing-window labor codes and small-pour premiums make up a control system, and that's CFO work. SPM does that CFO work for concrete flatwork contractors.

Three tiers, and which one you are in depends on how much of the work you want off your desk. On Core we build your plan every month and your team does the work: job costing built against the way you estimate, a 13 week cash forecast, monthly WIP, and a monthly meeting that ends in decisions, while your bookkeeper keeps doing the books. On Strategic we build the plan, track it and adjust it every month: our team does the bookkeeping and the bank reconciliations, and the job costing and WIP software is set up and managed for you, on your own online software or ours. On Platinum we manage the money side for you every week: our team handles your bills and receivables the way an in-house controller would, and you approve every payment. We don't do payroll.

Sixty days. We migrate your books back to the start of your last taxable year and build your job costing structure from scratch, and on Strategic and Platinum we set up the job costing and WIP software too. You're fully up and working in two months. The onboarding fee is one time, the same for every tier, and set by your revenue band.

ControlQore is the job costing and WIP platform we use on the Strategic and Platinum tiers. It's built for contractors, costs less than the older tools, and has AI built in. We set it up and manage it, so you do not have to learn it. Core is the CFO work only, so it does not include the software.

A bookkeeper records what happened. We tell you what it means and what to do about it. We align job costing to your estimates, track WIP monthly, and hold a monthly meeting where you decide what to fix and who fixes it.
$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time

How concrete flatwork CFO firms compare: the concrete flatwork firm study, with every score and its source.

WHAT ELSE BREAKS IN CONCRETE FLATWORK

MORE PROBLEMS WE PUT A NUMBER ON.

Decorative and elevated-deck divisions

Elevated deck vs slab on grade billing

Decorative work (stamped, stained, polished) is a different margin and warranty world than gray flatwork, and elevated decks pump against gravity with deflection-based levelness rules that differ from slab-on-grade.

Finishing crew economics on pour night

SF cost tracking

Flatwork's labor concentrates in the finishing window: the slab sets on chemistry's schedule, and the crew works until it's done, at whatever hour. Overtime lives inside the product.

Joint layout changes (the saw-cut change order)

Joint layout change order process

Joint layout is engineered, and field changes (added penetrations, revised column lines, owner aesthetics on decorative work) reshuffle sawing time and crack risk.

Small pours and premiums

Small pour premium pricing

Flatwork lives closer to short-load territory than structural concrete: sidewalks, pads, and patch pours ride the $40 to $60 per yard short-load fees and weekend premiums documented in the concrete file.

MORE ON CONCRETE FLATWORK

EACH CONCRETE FLATWORK PROBLEM HAS ITS OWN PAGE.

OTHER CONCRETE AND STRUCTURE TRADES

Concrete Flatwork is one of 8 trades in the concrete and structure family on our CFO for subcontractors page. Nearby trades with their own page:

WHAT THIS TIES INTO
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

THE CHEAPER OPTION WORKS AND TAKES LONGER.

If price comes first, plenty of CFOs and bookkeepers can get your construction company results. It often takes the better part of a year.

If you're a trade contractor, a sub or a GC who wins work, keeps the crews busy and still can't figure out where the money goes, we get in the weeds with you. We change the processes that cost you money on every job, build the ones you're missing and give you the formula, so you see results in 60 to 90 days.

Our guarantee holds when you come to every meeting, do the process and keep a strong pipeline of work. We can fix how your work pays. We can't fix having no work.

DO YOU KNOW YOUR TRUE MARGIN ON CONCRETE FLATWORK WORK?

Twenty minutes of questions about how you price concrete flatwork work, what your jobs come in at once they close, and what keeps coming back to your desk. Nothing gets sold on that call and nothing gets proposed. If Josh can help, you'll set a longer second call.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. No pitch or proposal. Josh asks questions to find out if he can help.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.