BLOG · CASH FLOW

RETAINAGE HELD: $220,000. PROFIT EARNED: $110,000.

Retainage is a percentage of the contract and profit is a much smaller percentage of the contract, so on a thin margin trade the hold is larger than the earnings. Painting finishes last, which means it waits longest to collect the bigger of those two numbers.

BY JOSH LUEBKERPublished November 17, 2026Updated November 17, 20264 min read
QUICK ANSWER

A painting sub at $2.2M with 10 percent retainage has $220,000 in holds. Painting at $1M to $5M averages 5 percent net profit before taxes, so the year earns $110,000. The hold is twice the profit. Painting is the last trade on site, so its release waits on every other trade's punch list, commonly 90 to 150 days past substantial completion. The money is safe, and you can't use it.

Your GC is holding only what he agreed to hold. The schedule put you last, and the contract set the hold as a percentage of revenue.

THE FULL BREAKDOWN

This post covers one balance sheet line and the queue behind it. That page covers how painting operates and where the trade's margin goes across a year. Read CFO for Painting Contractors for the complete treatment, worked figures included.

WHY IS THE HOLD BIGGER THAN THE PROFIT?

They're percentages of two different things. Retainage is a percentage of the contract. Profit is a percentage of what's left of the contract after labor, material and overhead come out.

At 10 percent retainage and 5 percent net profit before taxes, the hold is double the earnings on every job you finish, in every market, forever. That's math. Better production won't change it.

Painting at $1M to $5M averages 5 percent net profit before taxes, tied for the thinnest of the trades SPM serves. So painting has the worst ratio of hold to profit, and it waits longest to collect.

WHAT BEING THE LAST TRADE MEANS.

In most sequences painting goes on after drywall, casework and flooring. Then it goes on again every time another trade damages a wall closing its own punch list. So the painter is on site the whole time everybody else is closing out the project.

Retainage releases at project closeout. Your own closeout doesn't count. Your work can be complete and accepted, and your money is still held while a mechanical contractor argues about a balancing report and a glazier waits on a replacement panel.

That's why 90 to 150 days past substantial completion is normal for a painting sub's final release. You did nothing to end up last in line. The line ends where the project ends.

WHAT $220,000 OF HOLDS DOES TO A $2.2M SHOP.

A painting contractor at $2.2M with 10 percent held across the book has $220,000 held in other people's accounts. The business earned $110,000 that year at painting's 5 percent net before taxes.

So twice the year's profit is receivable. Payroll goes out weekly, and paint is COD or 30 days. The money that would pay for both is in a retainage column. That's why a profitable painting sub borrows.

Put a number on the borrowing. $220,000 drawn on a line at 9 percent costs about $19,800 a year in interest. That's 18 percent of the year's net profit before taxes. You pay a bank 18 percent of your earnings to wait for money you already earned.

MOST SUBS MISS THIS: THE HOLD OUTLIVES THE JOB COST REPORT.

Send this part to your bookkeeper. When a job closes, most painting subs close the job. The cost codes stop, the final billing goes out, the job cost report prints a final margin and everybody moves on.

The retainage doesn't close. It stays on the balance sheet in one lump receivable, often with no job number. After eighteen months nobody can tell you which project the oldest $14,000 belongs to.

That's how retainage gets lost. Nobody disputes it. Everybody forgets it. If no one owns a hold and it has no follow up date, nobody follows up, and the GC's accounting department won't remind you. Keep a retainage receivable by job, with a release date and a contact at the general contractor. Review it monthly whether the job is closed or not.

THE THREE LINES THAT SHORTEN THE WAIT.

You don't need a lawyer for any of these. All three go in the subcontract before you sign it. Subs who know to ask for them do.

1. Retainage reduction at 50 percent completion. Many GCs will drop the hold from 10 percent to 5 for a sub with a clean record once half the work is in place. It's the most valuable sentence a painting sub can add, and most never ask for it.

2. Release when your own scope is accepted, so project closeout no longer holds it. If the GC says no, ask for an outside date: released no later than 60 days after your substantial completion regardless of project status.

3. Stored materials and mobilization billable on the first draw. It doesn't change the hold. It brings cash in sooner on a trade whose paint bill comes due before the first billing goes out.

The retainage reduction alone, on the $2.2M book above, moves $110,000 from receivable to cash. That's the year's profit in your account twelve months earlier.

WHAT IT IS WORTH TO ASK.

Painting averages 5 percent net before taxes against a 10 percent target, so a $2.2M shop is $110,000 short of where the trade should be. Retainage won't close all of that, and nobody should say it will.

It's the piece you can change without selling more work, hiring anybody or raising a single production rate. A reduction clause and a dated release are two sentences in a contract you're already signing.

The last trade on the job has the least say over the schedule. It has the most say when the subcontract is signed, because that's the one moment the GC needs something from you.

WHAT TO DO WITH THIS

THE SHORT LIST.

Retainage is a percentage of the contract and net profit is a smaller percentage of the same contract, so at 10 percent held and 5 percent net before taxes, the hold is twice the earnings on every job.
Painting is the last trade on site, so its retainage releases at project closeout and not at its own, commonly 90 to 150 days after substantial completion.
A $2.2M painting shop holding 10 percent has $220,000 receivable against $110,000 of annual profit, and financing that on a line at 9 percent costs about 18 percent of the year's net before taxes.
Retainage outlasts the job cost report. Closed jobs leave holds in one lump receivable with no job number, and if nobody owns a hold, nobody follows up on it.
A retainage reduction at 50 percent completion is the most valuable sentence a painting sub can add. It brings the whole year's profit in about twelve months sooner.
COMMON QUESTIONS

FREQUENTLY ASKED.

Often yes, and most never ask. A reduction from 10 percent to 5 at 50 percent completion is common for a sub with a clean production and safety record, and asking is routine. Ask during subcontract negotiation, the one moment the general contractor needs something from you. If the GC says no, ask for an outside release date tied to your own substantial completion.

Retainage releases at project closeout, and painting is the last trade on site. Your scope can be complete and accepted while the hold waits on a mechanical balancing report or a replacement glass panel. You're also on site during closeout doing touch-ups on other trades' damage, and none of that is new billable work.

As a receivable by job, with the release condition, an expected release date and a contact at the general contractor. Review it monthly whether the job is closed or not. The common mistake is closing a job in the job cost system and letting its hold merge into one lump balance with no job number. Then the oldest money has no owner, and nobody follows up on it.
WHAT THIS TIES INTO
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

Josh Luebker is the author of CONTROL. Within 48 hours of its October 1, 2026 release the book ranked on Amazon: #1 in Construction Industry, #1 in Home Improvement Estimating, #9 in Financial Accounting. Captured October 2, 2026 at 8:03 PM Central.

HOW MUCH OF YOUR PROFIT IS IN SOMEBODY ELSE'S ACCOUNT?

Josh Luebker is a fractional CFO for painting and finish subcontractors at constructioncfo.net. A call is twenty minutes of questions about your retainage receivable, how old it is, and how it compares to your net profit. Josh won't sell you anything and he won't propose anything.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. No pitch or proposal. Josh asks questions to find out if he can help.

OR GET THE SOV AND PAY APPLICATION TEMPLATE. NO CALL NEEDED.