BLOG · FINANCIAL SYSTEMS

ONE OVERHEAD RATE. THREE DIFFERENT BUSINESSES.

Service agreements, replacement work and new construction have different overhead loads, different billing cycles and different labor. Put one blended rate on all three and the numbers you price from are wrong in both directions.

BY JOSH LUEBKERPublished October 27, 2026Updated November 13, 20265 min read
QUICK ANSWER

An HVAC contractor at $3.2M with $640,000 of service, $1.28M of replacement and $1.28M of new construction has about $512,000 of overhead at the trade's 16 percent rate. The true loads are closer to 26 percent on service, 16 percent on replacement and 11 percent on new construction. Put the blended 16 percent on all three and you underprice service by 10 points of overhead and overprice new construction by 5. Your strongest division looks ordinary, and a weak one looks acceptable. HVAC subs at $1M to $5M average 24 percent gross and 8 percent net before taxes.

Your estimator didn't make a pricing mistake. He was given one overhead rate for a company that has three.

THE FULL BREAKDOWN

This post covers one of the four numbers and how a divisional business breaks it. That page covers all four and how the trade is managed month to month. Read CFO for HVAC Contractors for the complete treatment, worked figures included.

WHAT ARE THE THREE BOOKS?

Service agreements are a recurring revenue business. Contracts renew. The customer pays before or shortly after the work, so cash comes back in days. The cost to serve is dispatch, on call rotation, truck stock and scheduling software. Gross margin is high, and every dollar of it is expensive to produce because somebody has to answer the phone at 9pm.

Replacement and retrofit is a consumer sales business. It follows the weather, it's often financed, and it depends on leads. The cost to serve is marketing, sales commission, financing administration and warranty reserve.

New construction is a contracting business. It's bid, submitted, scheduled, billed on a schedule of values, retained at 5 to 10 percent and collected in 45 to 90 days. The cost to serve is estimating, submittals, project management and the cash to cover the wait.

Those are three companies. Most HVAC contractors under $10M operate all three and report them as one.

WHY ONE OVERHEAD RATE BREAKS ALL THREE.

Take a $3.2M contractor: $640,000 of service, $1.28M of replacement, $1.28M of new construction. HVAC at $1M to $5M averages 16 percent overhead, so about $512,000. The natural thing is to put 16 percent on everything.

It doesn't break down that way. Service uses the dispatcher, the on call premium, the truck stock and the software license. Its real load is closer to 26 percent, or $166,400 against $640,000 of revenue. New construction uses the estimator and the project manager. Against $1.28M, its load is closer to 11 percent, or $140,800. Replacement is near the blended figure at about 16 percent, or $204,800.

Price service at a 16 percent overhead load and you're 10 points light on the division with the fastest cash and the highest margin. You're leaving money on the table on the only work that pays before you do. Price new construction at 16 and you're 5 points heavy on the division that's already the hardest to win. You lose bids you could have taken.

WHAT BREAK EVEN VOLUME MEANS NOW.

Break even volume is one of the four numbers, and it goes furthest wrong here. Break even is overhead divided by gross margin percentage. Both inputs differ by division.

Service at a 45 percent gross margin with $166,400 of overhead breaks even at about $370,000 of service revenue. New construction at a 19 percent gross margin with $140,800 breaks even at about $741,000. Those are two different answers. A blended break even of $512,000 over 24 percent gross, about $2.13M, fits neither of them.

So you can't answer the one question break even is for. If service revenue drops 15 percent next quarter, how much new construction do you have to sell to stay whole? With a blended number you can guess. With three numbers you can calculate it.

MOST SUBS MISS THIS: SERVICE IS FUNDING THE OTHER TWO.

Screenshot this part. In almost every HVAC company under $10M that hasn't split its books, service agreements are subsidizing new construction. And the P&L is set up so nobody can see it.

Service collects in days. New construction collects in 45 to 90 with retainage behind it. So service cash pays new construction payroll every week. The bank balance holds, so the company feels fine. It holds because one division gets paid fast enough to cover the other division's wait.

Plenty of good contractors do that on purpose, and it works. The problem is doing it by accident. If service is funding the company and nobody has said so, here's what happens in a soft quarter. Somebody discounts service agreements to keep volume up. The discount falls on the division that was funding everything else.

THE THREE STEPS TO SPLIT IT.

You don't need new software or a second company. You need three things in the chart of accounts and one decision per overhead line.

1. A division code on every revenue transaction and every direct cost transaction: service, replacement, new construction. Three codes, applied at entry, every time.

2. Every overhead line assigned to one division or split by a stated driver. Dispatcher to service. Estimator to new construction. Marketing to replacement. Rent by headcount, insurance by payroll, owner salary by time. Write the driver down so next year's allocation is the same allocation.

3. A divisional gross margin and overhead rate reported monthly, and a break even volume per division reviewed quarterly. Three columns on one page.

The first month is uncomfortable, because one division is usually worse than anybody thought. That's why you do it.

WHAT THIS IS WORTH ON $3.2M.

HVAC at $1M to $5M averages 8 percent net profit before taxes against an 11.5 percent target. On $3.2M that spread is roughly $112,000 a year.

Divisional pricing won't recover all of it, and anybody promising that is selling something. It recovers the two mispriced halves. Service gets priced at its real overhead load, 10 points above where the blended rate puts it. New construction gets bid without 5 points of somebody else's dispatch cost.

The second one is easy to miss. A new construction division that stops paying for service overhead can bid 3 to 4 points tighter without touching its own margin. In a trade where a point or two decides who gets the bid, that's the difference between a full schedule and a thin one.

WHAT TO DO WITH THIS

THE SHORT LIST.

HVAC under $10M usually means three businesses: service agreements, replacement and retrofit, and new construction. They have different overhead loads, cash cycles and labor, and they're reported as one company.
On a $3.2M contractor with $512,000 of overhead, the true divisional loads are roughly 26 percent on service, 16 on replacement and 11 on new construction. The blended 16 goes on all three.
The blended rate underprices service by about 10 points of overhead and overprices new construction by about 5. The best division looks ordinary, and a weak one looks acceptable.
A blended break even volume is meaningless. Service breaks even near $370,000 and new construction near $741,000, and no single figure fits both.
Service cash almost always covers the wait on new construction. If nobody writes that down, the first soft quarter brings a discount on the division paying the company's way.
COMMON QUESTIONS

FREQUENTLY ASKED.

Assign every overhead line to one division, or split it by a basis you write down. Dispatch, on call premium, truck stock and service software go to service. Estimating, submittals and project management go to new construction. Marketing and consumer finance administration go to replacement. Shared costs split by a stated basis: rent by headcount, general liability by payroll, owner compensation by time. Consistency counts more than the number, because the value comes from comparing the same split year over year.

Higher than the blended trade figure, usually by a wide margin. HVAC at $1M to $5M averages 16 percent overhead across all work. A service division with dispatch, an on call rotation, stocked trucks and scheduling software is commonly in the mid twenties as a percentage of service revenue. The direction is more reliable than the figure. If you've never split it, assume service has more overhead than you think and new construction less.

HVAC subs at $1M to $5M average 24 percent gross margin and 8 percent net profit before taxes. SPM's targets are 26.5 and 11.5. Those are published trade benchmarks at constructioncfo.net. By division, service usually comes in far above that average and new construction below it. That's why the blended figure is hard to price from.
WHAT THIS TIES INTO
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

Josh Luebker is the author of CONTROL. Within 48 hours of its October 1, 2026 release the book ranked on Amazon: #1 in Construction Industry, #1 in Home Improvement Estimating, #9 in Financial Accounting. Captured October 2, 2026 at 8:03 PM Central.

WHICH OF YOUR THREE BUSINESSES IS PAYING FOR THE OTHERS?

Josh Luebker is a fractional CFO for HVAC and mechanical subcontractors at constructioncfo.net. The call is twenty minutes of questions about your service, replacement and new construction mix, and how you split overhead across the three. Josh won't sell you anything and he won't propose anything.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.