STOP FINDING OUT YOU'RE SHORT THE MONDAY BEFORE PAYROLL.
Part 2 of Never Miss Payroll Without Taking On Debt covers the 13 week cash flow forecast. A forecast dated on when money really moves is the difference between managing payroll and discovering it. It is published in full, nothing is asked for, and it plays above. The first five sessions fix the five most common financial holes in a subcontracting business. The last one teaches you how to keep a pulse on all five and keep them within spec.
13-WEEK CASH FLOW FORECAST TEMPLATE, AND WHAT IT COSTS.
The 13 week forecast workbook is the one paid tool in the series. It also includes the overhead calculator that part four uses. It costs $49 once, it is the only tool in the series that costs anything, and the download link does not expire.
THE 13 WEEK CASH FLOW FORECAST, FIVE THINGS.
The subject outline, so you can see whether this is the hour you need before you spend it. Each one is worked through on screen with the math rather than described.
Why a forecast built on contract terms is wrong every month in the same direction, and how to date it on how each general contractor really pays.
Thirteen weeks rather than a month, because the week you need to see is rarely the one you're in.
Retainage as its own line, since it's money earned that nobody is going to send you on the normal cycle.
Reading the forecast as a decision tool rather than a report, which means it changes what you do this week.
What to do with a short week you can see coming, in the order that costs the least.
ALL 3 OF THEM, AND WHAT EACH ONE COSTS.
You do not have to watch in order to use these. If the thing hurting you today is two sessions away, take that workbook now and come back for the video when it suits you.
ONE OF 6, IN THIS ORDER.
The first five sessions fix the five most common financial holes in a subcontracting business. The last one teaches you how to keep a pulse on all five and keep them within spec. This is part 2, the cash forecasting part. Each one works on its own, and the order is what makes them compound.
Stop Finding Out You're Short the Monday Before Payroll
Your Equipment's Leaking Money, and It's Not the Maintenance Bill
The 10% Myth That Tanks the Bank Account
Losing Money Before You Even Get to Site
Reading the Red Flags While You Can Still Fix Them
THE SAME SYSTEM, ALL OF IT.
CONTROL: C.F.O.S. Construction Financial Operating System is the whole build order these six sessions walk, from job cost structure through to the monthly cadence that keeps it working. This session is the cash forecasting part. Every tool used across the series comes with the book: a QR code inside it, a password, and every CONTROL template downloadable at runoncfos.com. The paperback is $24.99.
This session is chapter 7 of the book. Chapter 7, Monthly Cadence, at runoncfos.com.
