SAGE 300 OR CONTROLQORE? SIZE DECIDES IT.

QUICK ANSWER

Sage 300 Construction and Real Estate is a deep, modular ERP built for mid-market and enterprise contractors with many entities. Below about $15M of revenue, most subcontractors pay for depth they don't use. ControlQore costs on revenue, goes live in 60 days and doesn't need a consultant. Above $15M, or with multiple entities and property management, Sage 300 is a serious product.

Sage 300 CRE is built for $15M to $250M. It costs per user, roughly $1,800 at ten users by an analyst estimate. Implementation takes several months with a dedicated internal person, at $5,000 to $50,000 or more by an analyst figure. WIP needs the Job Cost module. Sage has been steering new deals to Sage Intacct Construction. That's worth planning around, and it doesn't mean the product is discontinued. Its strengths are real: the deepest job costing and property management combination in the group, and a proper subcontractor compliance workflow. ControlQore documents 60 days and prices on revenue. Every Sage fact below comes from our software comparison page, last checked August 2026.

BY JOSH LUEBKERPublished October 2026Updated November 2026
SIDE BY SIDE

WHAT EACH ONE DOES.

CapabilitySage 300 CREControlQore
Built forMid-market and enterprise, many entitiesSubs and self-performing GCs wanting one platform for the long term
Revenue range it suits$15M to $250M$1M past $100M
How the price scalesPer user, roughly $1,800 at ten (analyst)SPM prices it on revenue, $150 per $1M of revenue per month, no seat fees
ImplementationMulti-month, dedicated internal resource60 days
WIPNeeds the Job Cost moduleBuilt in
Lien waivers and vendor complianceSubcontractor Compliance ManagementBuilt in, with e-signature
Procore integrationConnector built by ProcoreNative
Direction of the vendorSage steering new deals to Intacct ConstructionBuilt for the long term by its vendor
What growth asks of youNothing, it is the top of the Sage lineNothing

Sage publishes no price. The seat figure and the implementation range are analyst estimates, and the table says so. Every capability line is limited to what each vendor documents. The full 28-platform comparison, with a source and a date against every price, is on the software comparison page.

WHEN SAGE 300 CRE IS RIGHT

WHEN YOU ARE MULTI-ENTITY AND LARGER.

Sage 300 CRE suits mid-market and enterprise contractors and developers with many entities. Job costing is deep. Subcontractor Compliance Management gives you a real lien waiver and vendor compliance workflow. Procore builds and maintains the connector. If you use intercompany accounting and property management and have people who can own an ERP, it's a strong choice.

Under $15M the math changes. Implementation takes months and generally needs a consultant. The system is mostly on-premises. Cost rises with every licensed user. Annual maintenance costs roughly 18 to 22 percent of the license cost by an analyst estimate.

WHEN CONTROLQORE IS RIGHT

WHEN YOU WANT A LEDGER WITHOUT ENTERPRISE WEIGHT.

ControlQore is a construction ledger with WIP, job costing by phase against the estimate, pay applications, retention and lien waivers built in. SPM prices it on revenue at $150 per $1M of revenue per month with no per-user fees. Every project manager, foreman and estimator can be in the system at no extra cost. It works the same way at $1M and past $100M.

Implementation is documented at 60 days. It issues corporate cards with project spend limits, so a purchase is coded to a job when it's made. Its Procore integration is native. The honest limits: it's newer than the older platforms, so its track record is shorter. Inside an SPM engagement, we implement and operate it, so a contractor doesn't buy it and set it up alone.

THE ANSWER

WHERE WE COME OUT.

Stay on Sage 300 CRE if you're above $15M, operate multiple entities or need property management and intercompany accounting. That's what it's built for, and ControlQore doesn't claim to match it there.

Move to ControlQore if you're a sub below about $15M, you want a construction ledger without a consultant-led implementation, and you want to avoid a second migration later. It works the same at $1M and past $100M.

Do the move in a quarter, with both systems side by side. Align the cost codes to your estimating while you're in there. That work is what makes any platform change pay.

COMMON QUESTIONS

FREQUENTLY ASKED.

Often, below about $15M. It's built for mid-market and enterprise contractors with many entities. A sub with one entity and a small office usually pays for depth it doesn't use. Implementation takes months.

Nothing we've read says so. What's documented is that Sage has been steering new deals to Sage Intacct Construction. That's worth planning around. It doesn't mean end of life.

Sage publishes no price. An analyst estimate puts Sage 300 CRE from $200 a month for a single user, about $1,800 a month at ten users, with implementation at $5,000 to $50,000 or more. SPM prices ControlQore at $150 per $1M of revenue per month with no seat fees. Treat Sage figures as estimates and get a quote.

A flat monthly fee priced by your trailing twelve month revenue, from $1,900 per month for companies under $1M up to $14,900 per month at the top published band, with anything above quoted individually. No hourly billing. No payroll. A one-time onboarding fee is billed once, with the first invoice. The full band table, with both fees, is on the pricing page.
WHAT THIS TIES INTO
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

THE CHEAPER OPTION WORKS AND TAKES LONGER.

If price comes first, plenty of CFOs and bookkeepers can get your construction company results. It often takes the better part of a year.

If you're a trade contractor, a sub or a GC who wins work, keeps the crews busy and still can't figure out where the money goes, we get in the weeds with you. We change the processes that cost you money on every job, build the ones you're missing and give you the formula, so you see results in 60 to 90 days.

Our guarantee holds when you come to every meeting, do the process and keep a strong pipeline of work. We can fix how your work pays. We can't fix having no work.

RIGHT SIZE OR OVERBUILT?

Twenty minutes, and no pitch. Josh asks what you have on Sage today and what you really use. If it fits, he'll tell you to stay.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. Nothing gets sold on this call and nothing gets proposed. Josh asks questions to work out whether he can help at all.

OR GET THE WIP SCHEDULE TEMPLATE. NO CALL NEEDED.