T AND M RATE SHEET, READY TO EDIT.
Every piece of equipment you operate, priced by day, week and month, with the fuel it uses and what it costs to get it there, plus crew rates at regular and overtime.
If you price T and M work after the fact, whoever argues hardest sets the price. That's never the subcontractor. A published rate is also the only way your equipment gets paid for on T and M at all. A machine with no published rate is a machine you brought for free. It's emailed as an attachment, and everything you need to change is highlighted.
3 THINGS, IN ORDER.
Replace the example rates with yours. They're real numbers from a client engagement and they need vetting for your region, your wage determination and what you paid for the iron.
Put fuel in as gallons per hour per machine rather than one blended figure. An excavator at six and a loader at sixteen are different costs.
Get it attached to the subcontract. A rate sheet referenced in the contract is binding; the same sheet sent after the first change is a proposal.
No charge. The only thing asked for is an email address, and the file goes straight to it.The workbook has a branded How To Use tab and the form itself is left unmarked, because that's the page that goes to somebody else.
EVERY CONTROL TEMPLATE, ONE QR CODE.
Collecting these one email at a time works. A QR code printed in the book, with a password behind it, opening every CONTROL template as a download at runoncfos.com/cfos-toolkit. The paperback is $24.99 on Amazon.
