CFOS for QuickBooks, coming January 2027Join the waitlist: 12 months with no subscription fee
EXCEL WORKBOOK · TRACKERS · EMAILED

PROJECT DOCUMENT TRACKER, READY TO EDIT.

Six tabs covering everything a job generates: submittals, RFIs, change orders, drawing sets, purchase orders and open action items.

QUICK ANSWER

Most of the money lost on a commercial job is lost on a date nobody was watching. A submittal left unanswered, an RFI with no response, a change order requested and never submitted. None of it appears on a job cost report until the job is over. It's emailed as an attachment, and everything you need to change is highlighted.

HOW TO USE IT

3 THINGS, IN ORDER.

01

Fill the project header once on the Submittals tab. Every other tab reads it by formula.

02

Put the required response days in J1, off the specification. That number determines every due date column.

03

Log the day you send, because the due dates are formulas off it. Read the overdue items weekly before the job meeting.

EMAILED AS AN ATTACHMENT

No charge. The only thing asked for is an email address, and the file goes straight to it.The workbook has a branded How To Use tab and the form itself is left unmarked, because that's the page that goes to somebody else.

 

Your address is stored so the file can be sent and so you get three short emails about using it. Leave the box checked and you also get Margin Call, Josh's monthly newsletter. Unsubscribe in one click, any time. We will never sell your information.

OR TAKE THE WHOLE SET

EVERY CONTROL TEMPLATE, ONE QR CODE.

Collecting these one email at a time works. A QR code printed in the book, with a password behind it, opening every CONTROL template as a download at runoncfos.com/cfos-toolkit. The paperback is $24.99 on Amazon.

What the book coversThe tools

$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time
COMMON QUESTIONS

BEFORE YOU USE IT.

The only thing asked for is an email address, because it comes to you as an email attachment. It opens in Excel and in Google Sheets.

No. Every one of these was checked for personal details, addresses, phone numbers, email addresses and client references before it was published. Everything you need to change is highlighted, so the fields that make it yours are the ones a reader checks first.

Nothing you have to take. We will never sell your information. If you would rather have every CONTROL template at once, A QR code printed in the book, with a password behind it, opening every CONTROL template as a download at runoncfos.com/cfos-toolkit. The paperback is $24.99 on Amazon.

Josh may follow up once if it looks like a fit. You'll also get three short emails about using it, and the unsubscribe link in every one works immediately. Leave the Margin Call box checked and you'll get the monthly newsletter too, and unchecking it keeps you off that list.
EVERY TEMPLATE ON THIS SITE
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

WANT THE WHOLE SYSTEM RATHER THAN ONE FORM?

Twenty minutes, and no pitch. Josh asks what you've got in place, what you're missing, and where it hurts. Nothing gets sold on the call and nothing gets proposed. If he can help, you'll set a longer second call.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. No pitch or proposal. Josh asks questions to find out if he can help.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.