Right now you're pricing work you'll build next spring.
The numbers in your estimating sheet decide whether those jobs make money. Your overhead rate. Your labor rate. Your markup. Most owners set those once and haven't touched them in a year or more.
If they're wrong, every 2027 job you win starts behind before the crew shows up. Working harder in the field won't fix a number that was wrong in the bid.
Here are 4 numbers to check before you send your next estimate.
1. Your Overhead Rate
Pull your P&L for the last 12 reconciled months. Divide total overhead, or SG&A, by revenue. The result is your rolling overhead rate.
Compare it to the rate in your estimating sheet. If the sheet says 10% and your P&L says 14%, every bid you sent this year came up 4% short.
One warning. If your superintendent, foreman, small tools, or job trailer are sitting in overhead, move them to job costs first. Otherwise the rate comes out wrong.
Our free overhead calculator walks you through it: https://constructioncfo.net/how-to-calculate-construction-overhead-rate
Insurance Is Overhead. Who's Managing It?
This is sponsored by WithCoverage, the official insurance partner of Margin Call.
Most subs bid around 10% overhead. But when I pull the real number off the P&L, it runs closer to 18%-28%.
Insurance is one of the biggest lines in that gap. You've got general liability, workers' comp, auto, umbrella, and equipment. Plus, whatever the audit bill came to this year.
And nobody manages it.
The owner doesn't want to talk to an insurance agent. I get it. It's not fun. The bookkeeper pays the invoice. The broker sends a renewal once a year, you sign it, and the number goes into overhead without anyone asking why it changed.
But here's something you may not be considering...
A lot of brokers get paid a commission, a percentage of your premium. When your premium goes up, their pay goes up. Your broker may be a great person. The pay structure still doesn't reward anyone for bringing your number down.
So before you set your 2027 overhead rate, do this:
1. Pull every insurance payment from 2026. GL, workers' comp, auto, umbrella, equipment, and any audit bills. Get the specific total, not the quote from last renewal.
2. Divide it by 2026 revenue. That's your insurance percentage. Use it to update your overhead rate.
3. Ask your broker 3 questions (preferably, in writing). How are you paid on my account? What did my premium do at the last renewal, and why? When is my next audit, and what will it show?
4. Get a second opinion before you renew. Get one review against the current market before you sign anything.
Step 4 is where WithCoverage comes in. Their team reviews your whole program, GL, workers' comp, property, and umbrella, and benchmarks it against what the market is offering right now. They typically work for a flat fee agreed on up front. The review is free, and you can keep your current broker if the numbers say you should.
You can't fix an overhead line nobody is looking at.
The team at WithCoverage is great. They will do a free risk analysis for your business to identify coverage gaps and savings opportunities.
Start here: https://bit.ly/47ITi9W
Look at this one before you bid January.
2. Your Burdened Labor Rate
Your labor rate is the wage plus payroll taxes, workers comp, insurance, and benefits.
If you're giving raises in January, or your workers comp rate went up at renewal, your labor rate went up too. Update it in your estimating sheet before the raise starts.
Set a rate for each classification. A foreman, a journeyman, and an apprentice each get their own.
3. Your Markup
If you put the same percentage on every job, you don't know what that percentage covers.
Price each job from its own costs instead. Material, labor, equipment, subcontractors, tools, direct job expense, and other. Then add your real overhead rate. Then add the profit you want.
Some jobs will come out higher than your old markup, and some will come out lower. Either way, you'll know the price covers your costs.
4. Your Last 5 Closed Jobs
Put each estimate next to its final job cost report. Find the lines that came in over, and decide whether the miss was quantity, price, or production.
Fix those unit costs in your estimating sheet. If you skip this step, your 2027 bids repeat your 2026 mistakes.
What It Looks Like In Action
A plumbing contractor doing about $5 million came to us this fall. His crews were busy all year, and he finished at 3% net, about $150,000.
His estimating sheet had a 12% overhead rate from 2 years earlier. His last 12 months said 15%.
His sheet had a $42 burdened labor rate. After raises and a workers comp increase, his real rate was $46.
His crews work about 50,000 field hours a year. $4 an hour on 50,000 hours is $200,000. 3% of overhead on $5 million is $150,000.
Those 2 numbers left $350,000 of cost out of his bids.
We updated both numbers before he priced any 2027 work. Then we went through his last 5 closed jobs and fixed the unit costs that kept running over.
Some of his 2027 bids came in higher than he was used to, and he lost a couple of them. The jobs he won are priced to cover his costs and clear 10% net.
Go and Do
This week, open your estimating sheet and write down 2 numbers: the overhead rate and the burdened labor rate in it.
Then pull the real ones from your last 12 months of P&L and payroll.
If either one is off, fix it before your next bid goes out.
One More Thing
On December 9, I'm running a free session called Losing Money Before You Even Get to Site. I'll show you how to check an estimate against what the job will really cost before you send it.
Register here: https://riverside.com/webinar/registration/eyJldmVudElkIjoiNmE3MjRhNTA2NjZhOTY2MGY5YTg5MWY2Iiwic2x1ZyI6Impvc2gtbHVlYmtlcnMtc3R1ZGlvIn0=
Chapter 4 of my book CONTROL covers how to line up your estimating with your job costing, so you can run this check every time a job closes.
You can get it here: https://www.amazon.com/dp/B0HBCSJY9G