GRADING: DOT AND PUBLIC PAYMENT REGIMES
DOT work pays on measured quantities, agency estimates, and public-agency cycles; retainage and final acceptance stretch past private norms.
This page covers one problem. The other places this trade loses margin are on the grading operating system page.
WHERE THE MONEY GOES.
Covered in full in the quick answer above. The sourced numbers and what controls it are below.
THE NUMBER TO MEASURE IT AGAINST.
Grading contractors have about 2% net profit at $1M to $5M, rising to roughly 5% at $5M to $10M. The CFOS net profit target is 10% before taxes at $1M to $5M, the trade's average plus 3.5 points, never below 10%. You find a problem like this in the distance between those two figures. One bad job won't tell you.
Gross margin over the same bands is 18% to 20%,against CFOS targets of 25% and 24%.
THE SYSTEM THAT FIXES THIS.
Billing, documentation and collections, which is where the slow days come from.