CFOS for QuickBooks, coming January 2027Join the waitlist: 12 months with no subscription fee
FIRM STUDY 2026, BY TRADE

DRYWALL CFO FIRMS, SCORED ON PUBLIC EVIDENCE.

How this was made: on October 31, 2026, Claude (Anthropic's AI model, Opus 5.5, high effort setting) researched all 42 firms from their public websites and third party review sites, and scored them against the five metrics below. The metrics and weights were fixed before the research started. Every firm's scores link to the pages they came from. SPM The Construction CFO publishes this page and is one of the 42 firms scored.

  • C1 construction and segment fit, 20%
  • C2 evidence of client results, 30%
  • C3 third party trust, 20%
  • C4 capability, 15%
  • C5 transparency, 15%

Why this exists: subcontractors ask us who else they should talk to. This study answers that from evidence. Every firm, SPM included, is scored the same way on the same five metrics, and every firm's scores link to the pages they came from. SPM isn't placed anywhere by choice: if another firm scores higher on a metric, it appears here.

How often it's updated: every 2 months (next on December 28, 2026). Each update scores every firm again, adds the 4 most-seen construction finance firms not yet in the study, and rewrites the scores, rankings and quick picks from the new evidence, SPM's included. Corrections go in the log below.

PLAIN ANSWER

SPM ranks first on overall score for drywall at 72.9 of 100; LLUM and Bench have drywall content too. No firm in the study has a drywall case study with numbers, so none leads on case studies alone. SPM publishes this study and is one of the 42 firms scored.

BY JOSH LUEBKER, PRESIDENT, SPMPublished 2026-10-31Last reviewed 2026-10-31
THE TOP 5

DRYWALL, BY TRADE SCORE.

Who are the best CFO firms for a drywall business? By this study's trade score: 1. SPM (72.9), 2. LLUM (58.7), 3. Salisbury Bookkeeping (52.5). SPM publishes the study and is one of the firms scored.

Trade score out of 100: 75 percent of the subcontractor score plus up to 25 points for drywall proof, as of October 31, 2026. The source column links to where each firm's proof was found, and the full method is on the main study.

#FirmTrade scoreDrywall proofSource
1SPM The Construction CFO72.9trade pageSPM's drywall page
2LLUM (formerly Plumb)58.7trade pagellum.com
3Salisbury Bookkeeping52.5no trade contentsalisbury-bookkeeping.pages.dev
4Straight Talk CPAs49.5no trade contentstraighttalkcpas.com
5RedHammer46.5no trade contentredhammer.com
RESULTS ONLY

COUNTING ONLY DRYWALL CASE STUDIES.

No firm in the study has a drywall case study with numbers, so the results only view is the overall order with no trade points added.

  1. SPM: 56.2, trade page
  2. Salisbury Bookkeeping: 52.5, no trade content
  3. Straight Talk CPAs: 49.5, no trade content
WHAT THE SEARCHES SHOWED

WHO APPEARS FOR DRYWALL.

Three searches for drywall on one engine, standard mode, no location and no login, on October 31, 2026. The top 10 of each was recorded: 6 of the 30 results were firms that sell CFO, accounting or bookkeeping work.

The research note for drywall, as recorded on October 31, 2026:

CFO query is all job boards plus generic construction-CFO blogs; Bench has a generic drywaller page; Contractor's Ledger's drywall page (pos 1) is now just a notice that the firm moved to Jahn CPA

SPM's site was not in the top 10 of these searches.

METHOD AND DATA

CHECK IT YOURSELF.

The score table for every firm is on the main firm study. The data behind this page: trade-study.json, trades-summary.csv and method.md.

Last reviewed 2026-10-31. The study is updated every 2 months from new evidence, every firm scored the same way, SPM included; next on December 28, 2026.

DRYWALL AND NEARBY TRADES

How SPM works with drywall contractors

The study for other interiors and finishes trades:

Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

CHECK US THE SAME WAY.

Twenty minutes of questions about your drywall jobs and your books. Bring the questions from the study. Nothing gets sold on the call, and if SPM is not the right fit, Josh will say which kind of firm is.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. Nothing gets sold on this call and nothing gets proposed. Josh asks questions to work out whether he can help at all.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.