WORKING WITH INSURANCE BROKERS

HOW SPM WORKS WITH INSURANCE BROKERS: PAYROLL BY CLASS CODE, CHECKED EVERY YEAR.

QUICK ANSWER

Workers compensation premium is charged on estimated payroll and audited after year end, so a wrong class code costs the contractor every year until the audit finds it. The experience mod multiplies the premium: a mod of 1.25 pays 25 percent more than 1.00 on the same payroll and the same class codes. When a broker brings a client to SPM, SPM books payroll by job and class code, checks the mod worksheet against the books each year and puts insurance cost in the labor rate and the bid. The broker still advises on coverage and places the insurance. SPM does not handle payroll.

This page is for insurance brokers and agents with construction subcontractor clients. It covers the signs that a client needs its payroll and claims organized, how the work goes from the first call, and what the broker gets back.

BY JOSH LUEBKERPublished 2026-10-12Updated 2026-10-12
THE DEFINITION

WHAT IT MEANS.

When an insurance broker brings a construction subcontractor client to SPM The Construction CFO, SPM books payroll by job and class code, tracks claims by job and puts insurance cost in the right place in the bid, and the broker still advises on coverage and places the insurance.

The contractor remains your client for coverage and the carrier makes the underwriting decision. SPM organizes the payroll and claims records that your audit and your mod review are built from.

WHEN IT FITS

FIVE SIGNS A CLIENT NEEDS ITS PAYROLL ORGANIZED.

01

One class code covers the whole field crew

Many small contractors use one code for the field crew, usually the highest risk code for the trade. That overpays on every check for anyone who is not doing the highest risk work.

02

The premium audit comes in higher than the estimate

Premium is charged on estimated payroll and audited after year end. Payroll that is not recorded by class code makes the audit a negotiation over records that do not exist.

03

The mod rose and nobody checked the worksheet

The mod is built from three policy years. A wrong class code, payroll recorded in the wrong class, a claim left open longer than needed or a recovery that was never credited are each a reason to read the worksheet every year.

04

Workers comp is booked to overhead

Workers comp belongs in the burdened labor rate by class code. In overhead it underprices every labor heavy bid, and the overhead rate looks bloated while the labor rate looks cheap.

05

Claims are not tracked by job

A claim that is not recorded against the job where it happened, with its cost and status, leaves the contractor unable to answer the broker's questions at renewal.

THE MATH

WHAT IT LOOKS LIKE IN DOLLARS.

1.25 against 1.00

A mod of 1.25 pays 25 percent more than a mod of 1.00 on the same payroll. On $2M of payroll at a manual rate of $8 per $100, the premium is $200,000 at 1.25 and $160,000 at 1.00.

$64,000 a year

The difference between a 0.85 mod and a 1.25 mod on that payroll. On $6M of revenue it is 1.07 percent of revenue and about 15 percent of the profit at a 7 percent net margin.

3 to 8 percent of revenue

Insurance as an all in load is commonly 3 to 8 percent of revenue for commercial subcontractors, and the range depends on trade, class codes and mod.

HOW THE WORK GOES

FROM THE FIRST CALL TO THE RENEWAL.

The first call: twenty minutes with Josh

The contractor books the call from the scheduling page. Josh asks about cash, job costing and margins. Nothing is sold on that call and nothing is proposed.

The second call: a custom proposal

When SPM can help, the contractor books a longer second call. The proposal covers the scope for that contractor and the published monthly rate for its revenue band.

The first 60 days: the setup

SPM migrates the books and books the payroll the contractor's provider produces to the job and the class code, so the audit is checked against books and not memory. SPM asks for the mod worksheet when it is issued and checks the payroll, the class codes and the claims against the books. Workers comp goes into the burdened labor rate by class code and general liability goes into the bid base. Each claim is recorded against the job, with its cost and status.

Every month: the close, the WIP schedule and one meeting

The month is closed on a schedule, the WIP schedule is built from job cost, and the owner meets with SPM once. The meeting ends in decisions with dates. The owner's own time is about five hours a month.

$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time
PRICING

FLAT MONTHLY FEE. NO SURPRISES.

Three tiers, priced by your trailing twelve month revenue. Which one you're in depends on how much of the work you want off your desk. No hourly billing. No payroll. The one-time onboarding fee is right here in the table.

Last 12 months revenueMonthly feeOne-time onboarding
Up to $1M$1,900 to $2,900$1,000
$1M to $3.5M$2,600 to $3,900$1,500
$3.5M to $6.5M$3,800 to $5,700$3,000
$6.5M to $9.5M$5,100 to $7,100$4,500
$9.5M to $12.5M$6,100 to $8,500$6,000
$12.5M to $15.5M$7,400 to $11,000$7,500
$15.5M to $18.5M$9,400 to $13,500$9,000
$18.5M+Quoted individuallyQuoted individually

The onboarding fee covers migrating your books back to the start of your last taxable year and getting you fully operational in 60 days. It's billed once, with your first invoice. It's the same for all three tiers. Your first month is prorated, and your monthly engagement starts on the first of the first full month.

Range reflects the three tiers below. Which one you're in depends on how much of the work you want off your desk. No payroll. No hidden line items. The onboarding fee is right here in the table.

Core

You stop guessing.

You get the CFO work. Job costing built against the way you estimate, a 13 week cash forecast, monthly WIP, and a meeting every month that ends in decisions and never in a report.

Your bookkeeper still does the books.

Executive

You stop touching the books.

Everything in Core, and we do the bookkeeping and the controllership as well. Your office stops answering coding questions and stops fixing a reconciliation that will not balance on the last day of the month.

We do the books. No payroll.

Strategic

Every job shows its margin while it is still open.

Everything in Executive, plus the job costing and WIP platform set up, loaded with your cost codes, and managed for you every month. You never have to learn it.

We do the books, the job costing, and the software. No payroll.

COMMON QUESTIONS

FREQUENTLY ASKED.

No. SPM does not handle payroll. The contractor's payroll provider continues to produce it, and SPM books it by job and class code.

No. The broker advises on coverage and places the insurance. SPM organizes the payroll, claims and cost records.

Commercial subcontractors and self-performing general contractors with $1M to $12M in annual revenue, in the United States and Canada, in any of the 48 trades SPM benchmarks.

SPM publishes its monthly rate by revenue band on the pricing page, with the one time onboarding fee. The contractor reads the rate before the first call.

The contractor books twenty minutes with Josh Luebker from the scheduling page. Nothing is sold on that call. When he can help, the contractor books a longer second call.
WHAT THIS TIES INTO
Josh Luebker, SPM The Construction CFO
Josh Luebker
FRACTIONAL CFO · SPM THE CONSTRUCTION CFO

Josh Luebker is a master electrician turned construction CFO, president of SPM The Construction CFO and author of CONTROL: C.F.O.S. Construction Financial Operating System.

DOES THE PREMIUM AUDIT SURPRISE A CONTRACTOR EVERY YEAR?

The call is twenty minutes with Josh. He asks about the contractor's cash, job costing and margins. Nothing is sold on that call and nothing is proposed. When he can help, the contractor books a longer second call.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute call

20 minutes. Nothing gets sold on this call and nothing gets proposed. Josh asks questions to work out whether he can help at all.

OR GET THE WIP SCHEDULE TEMPLATE. NO CALL NEEDED.