EIFS AND STUCCO: DETAIL LABOR
Quoins, bands, cornices, and foam trim details price per linear foot of fuss, not per square foot of field; a bid built on field-wall rates donates every decorative element.
This page covers one problem. The other places this trade loses margin are on the eifs and stucco operating system page.
WHERE THE MONEY GOES.
Covered in full in the quick answer above. The sourced numbers and what controls it are below.
THE NUMBER TO MEASURE IT AGAINST.
EIFS and Stucco contractors have about 8% net profit at $1M to $5M, rising to roughly 10% at $5M to $10M. The CFOS net profit target is 11.5% before taxes at $1M to $5M, the trade's average plus 3.5 points, never below 10%. You find a problem like this in the distance between those two figures. One bad job won't tell you.
Gross margin over the same bands is 23% to 24%,against CFOS targets of 25.5% and 26.5%.
THE SYSTEM THAT FIXES THIS.
Cost codes built against the estimate, so a job can be read while it is open.