BENCHMARK · GROSS MARGIN

INSULATION GROSS MARGIN BENCHMARKS.

QUICK ANSWER

Insulation contractors average about 22% gross margin at $1M to $5M, rising to roughly 23% at $5M to $10M. The CFOS target at $1M to $5M is 23%, set at whatever gross margin produces that net profit once your overhead is paid, and never below your trade's own average. The distance between the average and the target is almost always overhead that was never loaded into the rate.

Insulation already runs 22 percent gross at this revenue, so the one point to a 23 percent target is worth $10,000 on a $1M year and $50,000 on a $5M year. The point is in spray foam yield, which is the one place in this trade where a single number moves the whole line. Foam is bought in chemical sets and sold in installed board feet, and the spread between theoretical and actual yield is set by geometry, temperature, and overspray on every job. Reconciling sets to board feet per job is the measurement, and a contractor who does it knows his waste factor while a contractor who doesn't repeats a number somebody told him in 2019.

BY JOSH LUEBKERPublished 2026-08-06Updated 2026-08-06

How to calculate: Gross margin is Revenue minus Direct Job Costs, divided by Revenue, times 100. Direct job costs include labour, materials, equipment and subcontracted work tied to the job. Not shop overhead, office staff or G and A.

THE BENCHMARKS

INSULATION FINANCIAL BENCHMARKS. WHERE YOU SHOULD BE.

METRICINDUSTRY AVERAGECFOS TARGETAT $10M TO $25MNOTES
Gross Margin ($1M to $5M)22%23%24%Industry figure rises to 23% at $5M to $10M and 24% at $10M to $25M.
Overhead Rate ($1M to $5M)14%13%12%Falls to 12% by $10M to $25M as fixed cost spreads over more revenue.
Days Sales Outstanding90 days45 days30 daysNinety days is weak, 45 is the target, 30 is strong. Nothing else moves cash faster.

Industry figures are the AVERAGE for the trade at each revenue band, from the SPM Trade Benchmark Reference, not a floor. Net profit is stated before taxes. The CFOS target is what we build toward. The third column is what companies at $10M to $25M average, shown for direction of travel; that is a larger company, which is a different thing from a better run one.

SOURCES AND METHOD

Trade figures are from the SPM Trade Benchmark Reference, 48 trades, published by Sulphur Prairie Management, LLC. Net profit is stated before taxes, on the same basis CFMA reports, so the two are directly comparable. Re-validate against CFMA reporting on the normal quarterly cycle, per the benchmark reference's own instruction.

The reference itself is published at read the insulation reference in full. The sourcing note behind the 48 trade set separates the survey data from our own analysis.

The same metric across every trade is published on Gross Margin by Trade, and the full dataset for all 48 trades across the published revenue bands is available as JSON and CSV, with one plain-language statement per row. Free to use with attribution.

PRICING

FLAT MONTHLY FEE. NO SURPRISES.

Priced by trailing 12 month revenue. No hourly billing. No payroll. No add-ons.

Last 12 months revenueMonthly fee
Up to $1M$1,900 to $2,900
$1M to $3.5M$2,600 to $3,900
$3.5M to $6.5M$3,800 to $5,700
$6.5M to $9.5M$5,100 to $7,100
$9.5M to $12.5M$6,100 to $8,500
$12.5M to $15.5M$7,400 to $11,000
$15.5M to $18.5M$9,400 to $13,500
$18.5M+Quoted individually

Range reflects the three tiers below. Which one you're in depends on how much of the work you want off your desk. No payroll. No hidden line items.

Core

You stop guessing.

You get the CFO work. Job costing built against the way you estimate, a 13 week cash forecast, monthly WIP, and a meeting every month that ends in decisions rather than a report.

Your bookkeeper keeps doing the books.

Executive

You stop touching the books.

Everything in Core, and we run the bookkeeping and the controllership as well. Nobody in your office is answering coding questions or chasing a reconciliation at month end.

We do the books. No payroll.

Strategic

Every job shows its margin while it's still running.

Everything in Executive, plus the job costing and WIP platform set up, loaded with your cost codes, and managed for you every month. You never have to learn it.

We do the job costing.

COMMON QUESTIONS

FREQUENTLY ASKED.

Insulation contractors average 22% at $1M to $5M and 23% at $5M to $10M. The CFOS target at $1M to $5M is 23%. Companies in the trade at $10M to $25M average 24%, which measures size and says nothing about how well the place is run.
Overhead that never made it into the rate, job costing that doesn't match how the work was estimated, and receivables aging past 45 days. The jobs still look profitable while all three are happening, which is why the number drifts without anyone noticing.
We rebuild the overhead rate from your actual financials, align job costing cost codes to your estimate structure, and track weekly variance against budget. Fully operational in 60 days.
$10.7M+
Client AR Recovered Since 2023
48
Active Trade Specializations
60 DAYS
Average Onboarding Time
WHAT THIS TIES INTO
Josh Luebker, The Construction CFO
Josh Luebker
FRACTIONAL CFO · THE CONSTRUCTION CFO

Former commercial project manager and master electrician: 150+ projects worth $2.1B combined, from $50,000 to $300M. Now fractional CFO to commercial subcontractors.

ARE YOU HITTING THE INSULATION GROSS MARGIN BENCHMARK?

Bring your last full year. We will put your actual number next to the benchmark and tell you what's moving it.

You don't hire a CFO because it's safe, you do it because the real risk isn't having one.
Book a 20 minute diagnostic

20 minutes. No sales pressure. We will tell you exactly what's broken before we talk about anything else.

OR START WITH THE WORKBOOKS. NO CALL NEEDED.