Structural Steel · Steel Erection · Ironwork · Metal Fab — Fractional CFO
Structural Steel · Steel Erection · Ironwork · Metal Fabrication

CFO for Structural
Steel Contractors.

Financial systems for structural steel subcontractors doing $1M–$12M. Structural steel erection, ironwork, and metal fabrication — we build job costing around shop vs. field cost separation, steel procurement lead times, and the schedule-dependent billing of structural steel work.

Schedule a Free Call → See Pricing
SPM vs. Other CFO Firms

Most CFO Firms Serving This Trade

  • High revenue minimums — most won't serve under $5M
  • Advisory only — no bookkeeping, no implementation
  • No job costing setup or ControlQore management
  • No monthly WIP as standard deliverable
  • No pricing published — discovery call required
  • No vetted partner network for bonding, lending, or liens
  • No prevailing wage specialty

The Construction CFO — SPM

  • Serves $1M–$12M — starts at $1,900/month
  • Full implementation — bookkeeping, job costing, CFO advisory
  • ControlQore setup and managed for you every month
  • Monthly WIP standard in Executive tier
  • Full pricing published — no discovery call to find out costs
  • Vetted partners for bonding, lending, lien services, payroll
  • Prevailing wage and Davis-Bacon specialty
What We See in This Business
01

Shop and Field Costs Are Mixed Together

Steel fabrication and erection have completely different cost structures. Shop costs — material, labor, overhead — are distinct from field costs — erection crew, crane, rigging. Most steel contractors mix these and can't see true margin on either.

02

Steel Procurement Lead Times Create Huge Cash Commitments

Steel must be ordered and fabricated months before field erection starts. Large steel jobs create significant material and shop labor commitments before any field billing is possible.

03

Schedule Delays Are Always Someone Else's Fault

Steel erection is dependent on concrete work below and other trades around it. Schedule delays push your erection start, compress your field time, and push billing dates — with no automatic contract relief.

How SPM Fixes It

Shop vs. Field Job Costing Separation

We build separate cost structures for shop fabrication and field erection in ControlQore so you see true margin on each phase and know whether your shop or your field is the profit center.

Steel Procurement Cash Flow Modeling

Executive clients get cash flow forecasting that builds steel purchase orders and shop labor commitments into the cash position so procurement timelines are visible months in advance.

Schedule Delay Documentation

We implement delay documentation tied to your job cost so schedule-driven impacts — extended general conditions, acceleration cost, lost productivity — are captured and submitted.

Service Tiers
Tier 01

Core Financial

Starts at $1,900 / month
  • ControlQore setup and management
  • Job costing aligned to your estimate structure
  • Cost-to-complete tracking — updated monthly
  • Full-service bookkeeping — minimum 30 min/week
  • Vendor payments via ACH (you approve, we initiate)
  • Accounts receivable management
  • Bank reconciliations and transaction matching
  • Controllership
  • 1 monthly CFO meeting
  • 60-day onboarding — books migrated to last taxable year
Most Popular
Tier 02

Executive Financial

Starts at $2,900 / month
  • Everything in Core Financial
  • Monthly WIP schedule — delivered every month, standard
  • 13-week cash flow forecasting
  • CEO Report — monthly financial dashboard
  • 3 CFO advisory meetings per month
  • Strategic accountability and actionable to-dos
  • Direct access to Josh Luebker
Pricing by Revenue
Revenue Range
(Last 12 Months)
Core Financial
Monthly
Executive Financial
Monthly
Under $1M$1,900$2,900
$1M – $3M$2,600$3,600
$4M – $6M$3,800$5,500
$7M – $9M$5,100$6,900
$10M – $12M$6,100$8,500
$13M+QuotedQuoted
Vetted Partner Network

National Lien Services

When AR gets too long, we connect you directly to our lien services partner to protect what you've earned.

Additional cost — not included in monthly fee

Payroll Integration Partners

Prevailing wage and regular payroll software partners integrated directly with ControlQore job costing.

Additional cost — not included in monthly fee

Bonding Partners

Surety relationships and bonding capacity support. We prepare the financials — our partners get you bonded.

Additional cost — not included in monthly fee

Lending Partners

Working capital lines and equipment financing through vetted lenders who understand construction.

Additional cost — not included in monthly fee

Reviewed Financials

CPA-level financial statement reviews for banking, bonding, and large contract requirements.

Additional cost — not included in monthly fee

CPA Coordination

We work alongside your existing CPA — not replacing them. Clean books and job costing make tax time easier.

Included — no extra cost

Common Questions

Straight answers.

What's included in Core Financial?
ControlQore setup, job costing aligned to your estimates, cost-to-complete tracking, full bookkeeping (minimum 30 min/week), ACH vendor payments (you approve, we initiate), AR management, bank reconciliations, transaction matching, controllership, and 1 monthly CFO meeting. Starts at $1,900/month.
What does Executive Financial add?
Everything in Core plus monthly WIP schedule, 13-week cash flow forecasting, CEO Report, and 3 CFO advisory meetings per month. Starts at $2,900/month. WIP, cash flow forecasting, and the CEO Report are Executive tier only.
Do you handle payroll?
No. We have vetted payroll software partners — including prevailing wage integrations — that connect directly with ControlQore. Those are separate engagements at additional cost.
How long does onboarding take?
60 days. We migrate your books to the start of your last taxable year, set up ControlQore, and build your job costing structure. Fully operational in two months.
What software do clients use?
ControlQore. All SPM clients run on ControlQore for job costing and WIP. We set it up and manage it — you don't have to learn it. Clients switching from QuickBooks, Sage, or other platforms migrate during onboarding.
Do you work alongside our CPA?
Yes. We work alongside your existing CPA — not replacing them. Clean books and accurate job costing make their job easier at tax time.
What happens when we grow past $12M?
We have a clear graduation path. We prepare your financials, systems, and team for the transition and connect you with the right firm for your next stage of growth.

See what's actually
going on.

Free 30-minute call. No pitch. We'll tell you straight what's broken and whether we can fix it.

Schedule a Free Call →
THE CONSTRUCTION CFO
Free Tools CEO Report Blog Services llms.txt Josh@ConstructionCFO.net
© 2026 SULPHUR PRAIRIE MANAGEMENT · SULPHUR ROCK, AR · SERVING US & CANADA
0