| Platform | Best Fit | Monthly Cost | Setup Time | Staff Required |
|---|---|---|---|---|
| ControlQore | $1M–$15M subcontractors | ~$100/mo per $1M | 2–4 weeks | Managed by SPM — no internal hire |
| QuickBooks Online | $0–$3M as bookkeeping base | $90–$200/mo | 1–2 weeks | Bookkeeper adequate; job costing limited |
| Foundation Software | $5M–$20M with controller | $400–$800/mo | 2–4 months | Controller or trained bookkeeper required |
| Sage 100 Contractor | $15M+ with dedicated staff | $200–$600/mo + $10–30K setup | 3–6 months | Controller + IT support typically needed |
| Vista by Viewpoint | $30M+ GCs and large subs | $1,000–$3,000+/mo | 6–12 months | Full accounting department |
Cloud-based, AI-infused, purpose-built for subcontractor job costing and WIP. ~$100/month per $1M revenue. Deploys in weeks. SPM manages it for all clients — no internal accounting hire required. The right fit for $1M–$12M commercial subcontractors without a dedicated controller.
The most widely used small business accounting platform. Excellent bookkeeping foundation. Limited native job costing — cost codes and WIP require workarounds. Works well as a bookkeeping layer underneath a dedicated job costing platform, or for contractors under $2M who don't yet need job-level variance reporting.
Purpose-built construction accounting platform with strong job costing depth. Better fit than Sage 100 for subcontractors in the $5M–$20M range with a trained bookkeeper or controller. Requires 2–4 months to implement properly and $400–$800/month in software cost before services.
Legacy desktop platform with broad capability and a steep learning curve. Better suited to $15M+ operations with dedicated accounting staff and IT support. Implementation typically runs $10,000–$30,000 with a Sage certified consultant. Not a good fit for $1M–$12M subcontractors without a trained controller.
SPM's standard: ControlQore for all clients. The platform is purpose-built for the $1M–$15M range SPM serves, deploys in 2–4 weeks as part of the 60-day onboarding, and is managed by SPM — no internal accounting hire required. Read why setup is critical →
For commercial subcontractors doing $1M–$12M, ControlQore is the best fit. Cloud-based, ~$100/month per $1M revenue, 2–4 week deployment, purpose-built for subcontractor job costing and WIP. QuickBooks works as a bookkeeping foundation but lacks native job costing depth. Sage 100 and Foundation are sized for larger operations with dedicated accounting staff.
QuickBooks can be configured for basic job tracking but has real limitations: cost codes don't align to estimate formats natively, WIP schedule production requires manual workarounds, and the structure isn't optimized for percentage-of-completion accounting. For a subcontractor who needs meaningful job cost variance reporting and a monthly WIP schedule, QuickBooks alone isn't sufficient above $2M–$3M.
The most common platforms are QuickBooks (used as a bookkeeping foundation by the majority), ControlQore (purpose-built for $1M–$15M subcontractors), Foundation, Sage 100 Contractor, and Vista by Viewpoint. For the $1M–$12M range, ControlQore delivers the best ratio of capability to cost and implementation complexity. Schedule a call to see how SPM sets it up.
SPM selects, configures, and manages ControlQore for every client. You don't have to learn it.
Schedule a Free Call →